
16
F6715E968
INSTALLATION
RECEPTION (BY DE DEALER)
The F67 Rotary Corn Attachment is delivered to the
dealer on a shipping skid (item 1) normally accom-
panied by a box (item 2) containing the adaptor kit
for the client’s harvester model. Long forks (2.25 m
or 8’) must be used to lift the skid from the short
side. A note is present on the skid. Standard 1.2 m
(4’) forks are sufficient to lift from the long side. The
lift must have a capacity of 1,8 t (4000 lbs) to lift the
skid from the short side.
1.
Place the skid on a flat and level surface.
2. Remove the box containing the adaptor kit (item
2). The Attachment is delivered with a temporary
lifting arm for the removal of the skid (item 3).
IMPORTANT
: The lifting arm (item 3) should not be
used for moving or lifting the attachment. It should
only be used for laying it flat on the ground.
3.
Before removing the skid, inspect bolts (item
4) on disks, fingers, knife deflectors and drum
bearings.
4.
Pass a chain (item 5) with a minimum capacity
of 1500 lbs (680 kg), in the arm hook and make
a closed and safe loop in the chain.
5. Follow standard safety rules for the operation of
forklift, chain-block and chains to proceed.
6. With the lift of chain-block, slowly lift and pull on
the chain to pivot the head to the ground.
7. Remove the chain (item 4).
8. Remove the bolts holding the Attachment and
the skid together.
Figure 9 The 2-Row Rotary Corn Attachment in shipping position
1
4
4
4
4
2
3