Paper box
3. Cover equipment in cabinet with clean dry cloth, or the inventory doesn’t lead
the electricity, and cover with paper box at position will be drilling and cutting in
order to prevent metal scrapt falling in cabinet. (see figure below)
4. Drilling the layout position in item 2 page 12 by following these following steps:
4.1 Drill 1 - 36 by applying drill bit size 1/8'' (3.2mm.)
13