12.Very importance for this step, tighten 4 screws from (2), while adjust level and
incline angle for appropriate water flow direction to water drain pipe
13.Stick foam tape, strat at position No.1 and end at position No. 2
Front
(TOP VIEW)
(1)
(2)
(1)
(2)
17