8. Electrical installation

  

 

WARNING: THIS EQUIPMENT MUST BE EARTHED. 

 

All electrical wiring must be carried out by a competent person and in accordance with the 

current 

I.E.E. Wiring Regulations.

  

The control equipment supplied will ensure that the cylinder functions safely. It is intended that these 
controls operate in conjunction with other control packages as described in the Solar system 
installation guide which incorporates a programmable time clock etc. 
 

8.1.The immersion heater 

- A 3kW 230v 50Hz immersion heater is supplied with the cylinder. It 

should be wired in accordance with the instructions given in Fig 8.1. The cable MUST be routed 
through the strain relief bush. We recommend that the control thermostat is set at 60

°

C, the high limit 

trip is factory set at 85

°

C.  

 

8.2 Immersion heater wiring instructions 

 

The immersion should be installed and wired in accordance with the instructions supplied with the 
immersion itself, the following should also be observed: 
 
8.2.1  Ensure the mains voltage corresponds to the voltage rating of the immersion heater as shown  

on  the rating label on the terminal cover. 

 
8.2.2  Insert the immersion into the immersion heater boss at the bottom of the cylinder. Tighten 

using an appropriate sized immersion spanner, or as required by the immersion instructions. 

 
8.2.3  Wire the immersion heater through a double pole isolator switch or controller, having contact 

separation of at least 3mm, using 1.5mm sq. flexible cable which must be fully earthed.

 

The 

live to the immersion should be wired through its thermostat and cut-out as shown in figure 
8.1, the Neutral to the Neutral terminal. 

 
8.2.4  In the event of the manual reset cut-out operating, isolate the immersion heater from the 

mains supply, investigate and identify the cause of the operation of this cut-out, rectify the fault 
before manually resetting the cut-out via the reset button on the cut-out. Finally switch the 
mains electricity supply back on. 

 
8.2.5  Do not install an immersion heater without a thermal cut-out. 
 

 

 

 
 
 
  
 
 
 

Fig 8.1

 

Fig 8.1 
 

WARNING: THIS APPLIANCE MUST BE EARTHED. 

 

Summary of Contents for SCx175sd

Page 1: ...SOLAR UNVENTED WATER HEATERS Installation and Operation Manual Important This Manual Should Be Left With The Cylinder After Installation...

Page 2: ...quirements 5 5 Primary circuit installation 6 6 Secondary circuit installation 6 7 Discharge arrangement 8 8 Electrical installation 10 9 Filling and commissioning 11 10 Servicing and maintenance 12 1...

Page 3: ...42 542 542 542 542 542 Solar Return mm 380 380 380 380 380 380 380 380 Cold Inlet mm 300 300 300 300 300 300 300 300 solar Coil size sqm 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Aux Coil size sqm 0 75 0 75 0 7...

Page 4: ...4 2 2 Connection 2 2 1 SOLAR Indirect 2 2 2 Single Coil Direct Electric...

Page 5: ...it to function but flow from the outlets will be low if several outlets are used simultaneously Correct performance is achieved with supplies between 3bar and 12bar The cylinder control equipment is f...

Page 6: ...nce with the solar installation instructions for connection to the primary flow and return 5 3 Two port Motorised valves The SCx Solar range of cylinders must only be connected to solar installations...

Page 7: ...ve should be connected to the secondary return of the cylinder See fig 4 1 4 2 IMPORTANT If a secondary circulation circuit is installed then a larger expansion vessel may be required to handle the in...

Page 8: ...lity at one or other of these locations Examples of acceptable discharge arrangements are Ideally below a fixed grating and above the water seal in a trapped gully Downward discharge at low level i e...

Page 9: ...diameter temperature relief valve with a discharge pipe D2 having 4 elbows and a length of 7m from the tundish to the point of discharge From the table above the maximum resistance allowed for a strai...

Page 10: ...the following should also be observed 8 2 1 Ensure the mains voltage corresponds to the voltage rating of the immersion heater as shown on the rating label on the terminal cover 8 2 2 Insert the imme...

Page 11: ...3 8 4 The Power Supply to the pump station should be connected via the lower 9 Filling and commissioning 9 1 Check that the expansion vessel charge pressure is 3bar 9 2 Check that all connections are...

Page 12: ...k that the immersion or boiler switches off when the cylinder reaches the desired temperature 10 Servicing and maintenance 10 1 Servicing and maintenance must only be carried out by a competent unvent...

Page 13: ...ked 3 Pressure reducing valve PRV fitted the wrong way 1 Open stopcock 2 Turn water supply off remove strainer and clean see 10 6 3 Re fit with arrow pointing in direction of flow Water from hot taps...

Page 14: ...ntrols supplied with the cylinder excluding the immersion for a period of 5 years from the date of purchase provided that they have been installed for their intended use by a competent person and have...

Page 15: ...m straight tundish SC06004 3kW Immersion heater SC070011 or SC070012 22mm Pressure reducing valve kit SC07015 22mm 2 port motorised valve SC06005 Twin Cylinder Thermostat SC06006 For assistance please...

Page 16: ...f practice It is recommended that your hot water system is serviced regularly and that your service engineer completes the appropriate Service Interval Record below SERVICE 1 DATE SERVICE 2 DATE ENGIN...

Reviews: