11
Fireplace Installation
Ensure that the 3-Position Switch is
set to the Off position ("O") and that
the circuit on which the fireplace is
to be installed has the power cut off
at the service panel until installation
is complete.
3. Lift fireplace and insert into
opening (Figure 5).
4.
Use bubble level (supplied) to
level the fireplace within the
framing. Adjust as required.
5. Drive four (4) supplied
mounting screws through
the four (4) mounting holes
located in each corner of the
fireplace chassis, into wall
studs (Figure 6).
6. Refer to Front Glass
Installation section, for final
installation procedures.
Flush Mounted
Installation - 200mm Deep
CAUTION:
Two people may
be required for various steps
of this procedure.
1.
Prepare a wall with a framed
opening of 837mm wide x 470
mm high (Figure 7).
!
NOTE:
The sizing has
allowed for approx 7mm around
the fireplace insert for ease of
installation. This fireplace does
not require any additional venting.
Figure 4