13
Installation
Figure 8
Standard Ceiling with a Factory-Built Chimney
Figure 9
Cathedral Ceiling with a Factory-Built Chimney
Refer to
Chimney Termination
& Height
section for details
on chimney cap.
Refer to
Chimney Termination
& Height
section for details
on chimney cap.
Chimney sections
Chimney sections
Chimney insulation
Refer to chimney manufacturer's
instructions and clearance
requirements for floor penetrations.
A ceiling support is required. An
attic insulation shield is required
where insulation is present.
Refer to chimney manufacturer's
instructions for minimum air space
to combustibles.
Chimney connector sections
Chimney connector sections
Refer to
Floor Protector
section
for the required dimensions of the
floor protector.
Refer to
Floor Protector
section
for the required dimensions of the
floor protector.
Refer to chimney manufacturer's
instructions and clearance
requirements for roof penetrations.
A storm collar and flashing or
radiation shield may be required in
some cases.
Refer to chimney manufacturer's
instructions for minimum air
space to combustibles
Refer to
Clearances to
Combustible Materials
section
for these stove clearances.
Refer to
Clearances to
Combustible Materials
section
for these stove clearances.
Termination Height
Minimum 15' (4.57 m)
Maximum 33' (10 m)
Termination Height
Minimum 15' (4.57 m)
Maximum 33' (10 m)
Refer to chimney manufacturer's
instructions and clearance
requirements for roof penetrations.
A storm collar, flashing, and
cathedral-style chimney support
required. A radiation shield may also
be required in some cases.