EN-6 452161.66.01 · FD 9307
www.dimplex.de
English
LIK 8TES
5 Transport
ATTENTION!
When transporting the heat pump, ensure that it is not tilted more than
45° (in any direction).
Use a pallet for transporting the heat pump to the final installation
location. The basic device can be transported with a lift truck,
hand truck or by means of 3/4" pipes fed through the holes in the
base plate or frame.
ATTENTION!
The heat pump and the pallet are only joined by the packing film.
Before using the holes in the frame, it is advisable to remove
each of the side panel assemblies. This is done by loosening
each of the two screws at the base and then withdrawing the
panels by unhooking them from above. Rehang the panels by
gently pushing them in an upwards direction.
After the transport, the transport securing device is to be re-
moved on either side at the bottom of the unit.
ATTENTION!
The transport securing device is to be removed prior to commissioning.
Opening the cover
Closing the cover
Remove/screw in
transport lock