![Dimplex ECSd125-580 Installation And User Instructions Manual Download Page 9](http://html1.mh-extra.com/html/dimplex/ecsd125-580/ecsd125-580_installation-and-user-instructions-manual_2505445009.webp)
In
st
al
lat
io
n
an
d
U
ser
I
n
st
ru
ct
io
n
s
R
0
1
1
2
7
-1
0
0
1
/1
6
Pa
g
e
9
Pre-Installation
4
Pre-Installation
Advice
Please read the following section
carefully
before
commencing
installation. If in any doubt, please call
the
appropriate
help
desk.
Disregarding the instructions given in
this manual in its entirety and any
relevant regulations, standards and
codes of practice will void the
guarantee of this product.
Handling – depending on the size of
the unit and access to its installation
location, consideration must be given
to the handling of the unit. Please note
that handling, installation and use of
this product is subject to the Health
and Safety at Work Act.
If the unit is not installed immediately,
it should remain in its protective
packaging with all pipe protectors/end
caps applied to prevent damage and
dirt deposit inside the cylinder and the
coils.
Pipe work – the pipe runs should be
executed as short as possible, unused
pipe work should be removed and all
remaining pipe work should be lagged
in
accordance
with
regulatory
requirements to prevent heat loss and
the formation of condensation.
Taps and fittings – all taps and
fittings incorporated in the unvented
system should have a rated operating
pressure of 0.6 MPa (6 bar) or above.
4.1
Risk assessment
The compilation of a risk assessment is
strongly
recommended
before
installing the product. The following
areas require particular consideration
in addition to the information required
by the Health and Safety at Work Act.
- scalding: where appropriate or
required by law a thermostatic
mixing valve is to be fitted to the hot
water outlet of the cylinder (see also
water borne organisms).
- explosion: the unit is fully equipped
with all relevant safety equipment to
comply with current regulations. The
correct design and function has been
verified by independent third party
testing. The correct application
thereof is the responsibility of the
competent installer.
- water
borne
organisms
(i.e.
Legionella): if applicable a risk
assessment should be carried out
following
the
recommendations
outlined in the Approved Code of
Practice L8.
- the user preference must be
considered when commissioning the
system, in particular when adjusting
the solar and auxiliary system
temperature and timer settings.
4.2
Siting considerations
When choosing a suitable location for
the cylinder the following aspects
should be considered:
- structural integrity
- access for installation, operation,
maintenance and replacement
- routing of discharge pipe work
- access to water mains supply, hot
and cold water distribution pipe work
- access to suitable electricity supply
- location in relation to remaining
system
components
such
as
auxiliary and solar heating system
Summary of Contents for ECSd125-580
Page 38: ...Installation and User Instructions R01127 10 01 16 Page 38 Notes...
Page 39: ...Installation and User Instructions R01127 10 01 16 Page 39 Notes...
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......