GB-4
English
5
5 Mounting
ATTENTION!
Mounting and initial start-up must only be performed by qualified
personnel! Improper installation will void any warranty claims! Please
use only suitable tools!
ATTENTION!
During installation, the user must also comply with the (connection)
requirements of the local utility companies and follow the installation and
operating instructions in addition to the valid national regulations.
5.1 Mounting the collector and the manifold
The individual parts on the brine manifold and the brine collector
must be connected according to Fig. 5.1 on page 4. Correct in-
stallation of the seals is especially important when mounting the
ball valves on the brine manifold and when assembling several
brine manifolds.
Fig. 5.1:
Mounting several brine manifolds
NOTE
Depending on the required abstraction capacity, the individual parts must
be connected according to the images shown below.
Mounting for systems with a maximum of 8 circuits (with connection package AP SVT)
Fig. 5.2:
Mounting of a brine manifold with a maximum of 8 circuits
Summary of Contents for AP SVT
Page 2: ......
Page 39: ...www dimplex de A V Anhang Appendix Annexes Za cznik 1 5...