11
Remark: The sensor cable can be extended up to 150 m when a cross section
of 3 x 1,5 mm
2
is used (max. 20
Ω
per conductor). The connection between
sensor cable and sensor extension can be made in junction box JB-86 or
equivalent. Use a shielded cable for extension to avoid interference. The
shielding braid is to be earthed in the thermostat.
5. Complete installation
A
A
A
Put the terminal protection cover back in place.
If RAYSTAT-CONTROL-10 is not yet programmed, please do so as described
in Operational description (page 11) and onwards.
Close the lid of the unit.
Ensure that the pipe and sensor are thermally insulated and clad to the de-
sign specification after installation of thermostat.
Seal cladding with sealant (A).
Operational description
1. Introduction
The RAYSTAT-CONTROL-10 parameters are configured via a menu system.
The unit is delivered with a battery so that the operating parameters can be
set up without any need for the power supply to be connected. This is useful
for setting units on the bench prior to mounting in their working location or
on site when power isn’t available.
Ray C F030793 RAYSTAT-Contr-N
18-09-2003, 10:14
11