background image

Installation of power supply

Installation of power supply

1)

Take the remaining four Velcro pads and press two corresponding pairs together. Now you have two Velcro 
pad pairs with a protective film on each side (also see Page 3, Fig. 1).

2)

Remove the film on one side of each pad pair and press this side to the bottom of the synthetic box. Press the 
divider pads to the back side of the DataCourier. Now you can attach the synthetic box to the left inner side of the 
DataCourier by removing the remaining protective films.

CAUTION! 

You must first insert the power plug through the round opening (!) to the side pocket (This can be done on the left 
or right side). In case a Velcro pad is already attached to the inner left side, you need only remove the protective 
film of the corresponding side and attach it to the bottom side of the synthetic box (Fig. 5).

(1)

Fig. 5

How to store the power supply units:

The power supply units are stored on the inside of the synthetic box.

1)

Open the retractable lid. Place the power supply units that belong to your printer and Notebook into the 
storage space (Fig. 6 (1)).

2)

Connect the power supply units for Notebook and printer with the Euro 8 power socket (220 V) provided. 
The power cables for Notebook and printer can be led through the slots on the left- and right-hand side 
of the lid (Fig. 5 (1)). Then replace the lid – done! (Fig. 6)

Storage of power supply units

Storage of power supply units

Fig. 6

(1)

9

User Manual DataCourier

Summary of Contents for DataCourier none

Page 1: ...Gebrauchsanleitung DataCourier Seite 1 User Manual DataCourier Page 6 Mode d emploi DataCourier Page 11 DataCourier...

Page 2: ...rbindung Notebook Drucker 5 User Manual English 6 Manuel d emploi Fran ais 11 1 Arbeitsumgebung Bitte achten Sie grunds tzlich darauf dass Ihre DataCourier auf einer stabilen rutschfesten Arbeitsfl ch...

Page 3: ...1 1 x 220 V Kaltger testecker Kabelbaum 2 x EURO 8 und 2 x IBM 2 Kunststoffbox mit Kabelbaum 3 8 x 3M Velcro Pads selbstklebend 4 3 x Schl ssel 5 Herausnehmbare Aktentasche 6 Gepolsterter Schultertrag...

Page 4: ...ogen werden Klettpads k nnen auch in der Mitte des Druckers platziert werden ACHTUNG Bevor Sie den Drucker anbringen berpr fen Sie seine Position auf der Klappe da sich eine Falschpositionierung nacht...

Page 5: ...hrung kann links oder rechts genutzt werden Ist bei Ihrer DataCourier bereits werkseitig ein Klettbandst ck an der linken Innenseite befestigt so brauchen Sie nur den Schutzfilm des Gegenst cks abzuz...

Page 6: ...ang der DataCourier Achten Sie auch hierbei auf eine saubere Kabelf hrung Am besten f hren Sie das USB Druckerkabel um den Drucker herum Beachten Sie weiterhin dass das USB Druckerkabel den Druckpapie...

Page 7: ...on of power socket 9 Storage of power supply units 9 Connection Notebook printer 10 6 Work Environment In general please take care to operate your DataCourier on a stable and skid fast surface Especia...

Page 8: ...1 1 x 220 V power socket cable tree 2 x EURO 8 and 2 x IBM 2 Synthetic box with cable tree 3 8 x 3M Velcro pads self adhesive 4 3 x keys 5 Removable briefcase 6 Padded shoulder strap Features DataCou...

Page 9: ...e tape must still be removed the Velcro pads can also be placed in the center of the printer CAUTION Before you mount the printer please check the intended position on the flap since incorrect mountin...

Page 10: ...e done on the left or right side In case a Velcro pad is already attached to the inner left side you need only remove the protective film of the corresponding side and attach it to the bottom side of...

Page 11: ...ot included in the DataCourier Ensure correct cabling here as well It is best to lead the USB cable around the printer Also make sure that the USB cable is not obstructing the paper bin thus causing p...

Page 12: ...ation 14 Raccordement de l ordinateur portable et de l imprimante 15 11 Conditions d utilisation V rifiez que la mallette DataCourier est install e sur une surface stable et antid rapante Evitez tout...

Page 13: ...ur connexion au 220 V 2 ensembles de c bles 8 EUROS et 2 IBM 2 Bo te en mati re plastique avec groupe de fils 3 8 bandes velcro 3M autocollantes 4 3 cl s 5 Pochette amovible 6 Bandouli re matelass e q...

Page 14: ...ollant blanc doit tre retir Les bandes Velcro peuvent galement tre dispos es au millieu ATTENTION V rifier la position de l imprimante sur le rabat avant de l installer Un mauvais positionnement pourr...

Page 15: ...passage peut se faire par la gauche ou par la droite Si votre DataCourier est d j dot e d une bande Velcro sur sa partie int rieure gauche il suffit de retirer la partie correspondante et le film de p...

Page 16: ...lement que le cheminement du c ble n est pas entrav Pour une utilisation optimale faites passer le c ble USB sur le c t de l imprimante V rifiez ensuite que le c ble USB n entrave pas la sortie du pap...

Reviews:

Related manuals for DataCourier none