SSE-
006 UV Water Sterilizer operator’s manual
SSE-006 UV
water sterilizer Operator’s Manual
version 04.07.19
Page
4
/
4
8.
System Installation
Step 1:
Open package to check all
components inside: Reactor Chamber,
UV Lamp, Quartz Tube, O-ring,
Electronic Ballast and Support.
Step 2:
Make sure the Quartz Tube and UV
Lamp are clean before installation (clean
with alcohol or mild detergent). Wear soft
non-abrasive gloves to keep any finger marks
away from them.
Step 3:
Remove End Nut from
Reactor Chamber.
Step 4:
Install O-ring onto the open
end of Quartz Tube (12mm from the
edge).
Step 5:
Insert the Quartz Tube into the
Reactor Chamber.
Step 6:
Hand-screw End Nut on
the Reactor Chamber. To protect
the O-ring, do not over tighten.
Step 7:
Connect 4-pin Electrical
Socket with UV Lamp pins tightly.
Step 8:
Carefully insert the UV Lamp into
the Quartz Tube through End Nut.
Step 9:
Install the Cover Cap and
hand-tighten onto End Nut.
Step 10:
Select a readily accessible
and well lit location to fix the system.
The system should always be located
closest to the point of use and can
either be installed horizontally or
vertically.
Step 11:
When all plumbing connections are finished, slowly turn on the water
supply and check for leaks.
Step 12:
Allow the water to run for a few minutes to clear any air or dust that may
be in the Reactor Chamber.
Step 13:
Connect the power for starting up.
1 Reactor Chamber (304SS)
2 Quartz Tube
3 O-ring
4 Open End Nut
5 UV Lamp
6 4-pin Electrical Socket
7 Cover Cap
8 Electronic Ballast
9 Fitting 1/4°
10 Support