The fresh air flow required to provide air for combustion is:
- PSR 400 GE
- PSR 900 GE
19,2 m3/h
General conditions for installation
The installation and maintenance of the appliance must be carried out in accordance with the
current regulations and rulebook, in particular:
Regulations for the prevention of fire and panic in establishments to which the public is
admitted:
General provisions
For all appliances:
Article GZ
Installations using combustible gases and liquid
hydrocarbons.
Next, depending on the use :
Article CH
Heating, ventilation, refrigeration, air conditioning and the
production of steam from hot water in sanitary installations.
Article GC
Installation of appliances to be used for catering
Specific provisions for each type of establishment to which the public is admitted (hospitals,
shops, etc…)
Changing the gas
Important: Do not rebore the injectors.
Table of gas categories, according to country of destination of the appliance
Country of destination
Category
Gas
Pressures
Diameter of
injector
France/Luxembourg
II2E+3+
II2E+3B/P
G20/G25
G30/G31
G20/G25
G30/G31
20/25
28-30/37
20/25
50
135
90
135
85
Germany
II2E3B/P
G20
G25
G30/G31
20
20
50
135
150
85
Austria
II2H3B/P
G20
G30/G31
20
50
135
85
Belgium
I3+
I2E
G30/G31
G20/G25
28-30/37
20/25
90
135
Sweden, Denmark,
Finland
II2H3B/P
G20
G30/G31
20
30
135
90
Spain
II2H3+
II2H3P
G20
G30/G31
G20
G31
20
28-30/37
20
50
135
90
135
85
Netherlands
II2L3B/P
II2L3P
G25
G30/G31
G25
G31
25
30
25
50
140
90
140
85
Norway
I3B/P
G30/G31
30
90
Iceland/Greece/United
Kingdom/Italy/Portugal
II2H3+
G20
G30/G31
20
28-30/37
135
90
Injector N°
Gas
Pressures
Diameter
Injector n°1
G30 / G31
Butane/Propane 28-30/37
90/100
Injector n°2
G30 / G31
Butane/Propane 50
85/100
Injector n°3
G20 / G25
Natural Gas 20-25 135/100
Injector n°4 G25 Natural Gas 25 140/100
Injector n°5 G25 Natural gas 20 150/100
Injector n°6 G31 Propane 50 85/100
Air adjustment
Diagram showing measurement of the air adjustment mark in the table above.