Summary of Contents for Reliant DRS4-EM-15

Page 1: ......

Page 2: ...ould have received _____ 1 Control Valve Figure 2 _____ 2 Brine Tank Figure 4 _____ 3 Brine Line Hose _____ 4 Softener Tank Figure 5 _____ 5 Correct Amount of Resin from Model and Media Requirements T...

Page 3: ...he first time 6 8 Bypass Valve Operations 6 9 Main Operating States 9 10 Program the Valve 10 11 Backwashing 13 12 Troubleshooting 14 13 System Specifications 14 14 Error Codes 15 Table 1 Media Requir...

Page 4: ...the face of the control valve once it has been secured to the face of the control valve Make sure that the system is positioned in a way that the plumbing can be installed D Before Filling the Tanks e...

Page 5: ...s in a correct position to be able to install the plumbing 5 Connect the brine tank A Remove the ties on the brine line hose included in the brine tank B Remove the well cap and connect one end of the...

Page 6: ...Temporarily run the control valve outlet to the drain Note Make sure all piping is free of thread chips and other foreign matter 7 Electrical The Water Filter use requires single phase 110 volt 1 phas...

Page 7: ...o slowly enter the tank shown in figure 14 d Once the tank is filled only water will be coming out of the drain line Put the system back into bypass operation Run each step of the regen cycle Figure 2...

Page 8: ...s of operation Treated Water Exits Supply Water Enters Figure 16 Normal Operation Supply Water Enters Supply Water Exits Figure 17 Bypass Operation Supply Water Enters Supply Water Exits Figure 18 Dia...

Page 9: ...through Brine Line Valve to Resin Bed Hardness ions are then replaced by sodium ions preparing Resin for another treatment cycle The Regenerate flows through resin at a specific rate to exchange ions...

Page 10: ...e will enter from and return to the power on reset routine The self test routine will test all inputs and outputs A simple test fixture will be used to connect to the outputs and inputs C Standby Powe...

Page 11: ...ng The regenerating routine handles the operation of the motor to position the cam in various positions as needed to perform regeneration of the resin bed 11 Program the Valve All of the parameters on...

Page 12: ...es P1 Time of Day 1 00 12 59 AM or PM 0 00 23 59 1 minute 12 00 PM hour minute Range depends on value selected for P10 P2 Day of Week N A 1 day None N A Uses arrows under days of week on overlay P3 Ti...

Page 13: ...one Day of Regeneration selected Can be locked out of changes in Level I programming P6 Set Amount of Regenerant S H L N A S N A S Standard 9lbs ft3 resin H High 15lbs ft3 resin L Low 3lbs ft3 resin L...

Page 14: ...e 4 Level II Programming Parameter Description Range of Values Minimum Increment Default Units of Measure Notes P9 Units of measure 0 1 1 0 0 US 1 Metric P1 0 Clock mode 0 1 1 0 0 12 hour clock 1 24 h...

Page 15: ...PARTS AND ACCESSORIES RELIANT Valve Exploded View 1 2 3 4 5 6 7 8 9 11 12 14 15 16 10 18A 20 21 17 19 13 18B Warning Do not use flow control ball with 18A 22 22 23 pg 14...

Page 16: ...Pink 12 Tank 60 0023 XX L Injector Orange 13 Tank 16 31 0007 XX Injector Cap 1 17 Drain Line Flow Control Assy 1 16 0016 XX No 7 1 3 gpm 16 0017 XX No 8 1 7 gpm 16 0018 XX No 9 2 2 gpm 16 0019 XX No...

Page 17: ...r three seconds while the control is in the regenerating mode The x2 icon next to the regeneration icon will turn on indicating a second manual regeneration will start immediately after current regene...

Page 18: ...e to find the next cycle position and stalled Foreign material is lodged in control valve Open up control valve and pull out piston assembly and seal stack assembly for inspection Press NEXT and REGEN...

Page 19: ...resynchronize software with piston position or disconnect power supply from PC board for 5 seconds and then reconnect Drive bracket not snapped in properly that reduction gears and drive gear do not i...