background image

14. BAG REPLACEMENT

1- 

Cut the Infinity Bag in order 

to let it open.

2- 

Pull and rotate the retaining pins 

of the Infinity bag container in order 

to unfasten them.

3- 

Remove the Infinity Bag container and 

any waste.

4- 

Insert the new Infinity Bag with the inner 

part facing upwards.

5- 

Cut and remove the Infinity Bag closing bands.

7-

 Pull the outer part of the bag to 

create a new one. 

8- 

Insert the container with the 

Infinity Bag.

9-

 Pull and rotate the retaining pins 

and insert them into their seats.

10- 

Pull the bag and place at the 

edge the band to create a new 

one. If necessary use two bands. 

6-

 Keep the inner part of the bag 

inside the container and pull it up to 

the lower edge.

Summary of Contents for TVX-A

Page 1: ...OWNER S MANUAL TVX A INDUSTRIAL VACUUM USER MAINTENANCE BOOK SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE ...

Page 2: ...o TVX vacuums must be regis tered within 30 days of purchase Registration can be completed online at www DiamaProSystems com To request your warranty service you MUST send a written request to DiamaPro Systems 3343 Peachtree Road NE Suite 145 24 Atlanta GA 30326 including the manufacturing details that can be found on a plate fitted inside your machine together with a copy of the invoice The warra...

Page 3: ...et Repairs must only be carried out by authorized personnel and only when the machine is turned off and disconnected from the power source Never allow unauthorized personnel to use the machine Make sure that all safety devices are in full working order before turning on the machine Never cover the vacuum cleaner during use 7 INSTALLATION 7 1 DELIVERY AND HANDLING All machines are carefully tested ...

Page 4: ...ed in a bag placed in the container under the hopper The Infinity Bag system consists in a plastic tubular from which are ob tained 20 30 bags of different weights and dimensions Once finished or damaged the tubular must be replaced by a new refill The operations below described must be carried out when machine is turned off Before switching ON the vacuum be sure the container is empty 1 3 2 2 Pus...

Page 5: ... Bag with the inner part facing upwards 5 Cut and remove the Infinity Bag closing bands 7 Pull the outer part of the bag to create a new one 8 Insert the container with the Infinity Bag 9 Pull and rotate the retaining pins and insert them into their seats 10 Pull the bag and place at the edge the band to create a new one If necessary use two bands 6 Keep the inner part of the bag inside the contai...

Page 6: ...15 ELECTRIC DIAGRAMS TVXA 220V WIRING DIAGRAM 1 STARTER 2 TOGGLE COMMUTATOR 1 0 3 MOTOR 4 ELECTRONIC CARD 5 VIBRATOR 6 SOLENOID 7 CONTACTOR COIL 8 ELECTRO TOOL CONNECTIONS ...

Page 7: ...6 ELECTRIC DIAGRAMS TVXA 480V WIRING DIAGRAM 1 STARTER 2 TOGGLE COMMUTATOR 1 0 3 MOTOR 4 ELECTRONIC CARD 5 VIBRATOR 6 SOLENOID 7 CONTACTOR COIL 8 ELECTRO TOOL CONNECTIONS 9 TRANSFORMER TOROIDAL 400 230V ...

Page 8: ...17 HOPPER ASSEMBLY ...

Page 9: ...18 FRAME ASSEMBLY ...

Page 10: ...19 HEAD ASSEMBLY ...

Page 11: ...DiamaPro Systems 3343 Peachtree Road NE Suite 145 24 Atlanta GA 30326 470 977 2323 ...

Reviews: