Equipment installation
In the interest of safety, this equipment must only be installed by competent personnel after read and understood
this section and considered any hazard involved. Even though no particular hazards have been identified during this
installation.
Before starting installation work, turn the main switch off (beyond power connection) and secure the unit against being
re-energized.
No special tools required.
Installation shown below is performed on a NESLAB RTE Bath Circulator.
Location Requirements
• Never install this equipment in a place where Environmental Conditions mentioned above are infringed.
• 3 meters square needed to set up the whole equipment.
• Distance between chiller and sonication baths should not be more than 1.5 meters, vertically or horizontally.
• Additional power plugs including earthing terminal needed for the pumps.
Global scheme
a) Connection to Bioruptor
®