background image

JINDLU04 Rev G 21/04/16 

 

If connecting to an existing masonry

 chimney 

it is recommended that a flue forming pipe 
(short length of flue pipe) is used and the void 
between the flue forming pipe and the 
chimney filled with vermiculite concrete. 
A suitable access hole will need to be made in 
the chimney breast to allow the back filling to 
be carried out and then filled and sealed once 
the installation is complete.  
Alternatively a connection can be made using 
a register plate although it will be necessary 
to allow access for fitting the flue pipe to the 
register plate and sealing all joints.  

 

 

R

E

-A

SSEMBLING 

T

HE 

S

TOVE

 

1.

 

Refit the base fixing access plate and 
gasket, Air Valve Cassette (with the air 
controls set to maximum), firebricks, 
brick baffle and log retainer.  

2.

 

Wind the M6 Nuts to the ends of the 
studs on the convection chamber 
sides. 

3.

 

Slide the Frame in to position and 
tighten the nuts with a 10mm 
spanner.  
 

Summary of Contents for CVSDL04-FP3BLK

Page 1: ...JINDLU04 Rev G 21 04 16 Wood Burning Inset Stove Installation and Operating Instructions CVSDL04 FP3BLK CVSDL04 FP4BLK CVSDL04FP3PWT CVSDL04 FP4PWT R4...

Page 2: ...s Park Exeter United Kingdom EX1 3QS DSEN13229 Inset Wood Burning Stove Appliance Mass 70kg Efficiency 79 Nominal Heat Output 4 9kW Mean Co Emission 13 O2 0 09 Mean OGC Emission 13 O2 99 mg m3 n Mean...

Page 3: ...ons scheme it is a legal requirement in the UK to notify your local building control body in advance of any work starting HEALTH AND SAFETY PRECAUTIONS Special care must be taken when installing the s...

Page 4: ...stent fume emission must not be tolerated This appliance should not be operated with the doors open If fume emission does persist then the following action should be taken immediately Open Doors and w...

Page 5: ...terials The dimensions of the opening should be at least those shown in the diagram Ensure there is a sufficient overlap where the convection chamber flange meets the face of the opening If not either...

Page 6: ...the kit before proceeding HEARTH REQUIREMENTS A constructional hearth with a minimum thickness of 125mm should be provided The constructional hearth should be made of solid non combustible material an...

Page 7: ...cordance with Building Regulations Approved Document J or a twin walled insulated stainless steel flue to BS EN 1856 can be used These chimneys must be fitted in accordance with the manufacturer s ins...

Page 8: ...xings and the flue outlet as well as protect the internal components from damage during the installation process 1 To open the stove door press on the door lever to release it from the latch Swing the...

Page 9: ...s into the centre and remove them from the stove 5 Remove the three rear brick sections noting their positions and orientation 6 Lift up and remove the base brick 7 Remove the Air Valve Cassette by re...

Page 10: ...ce 2 Drill a 6mm hole into the hearth in the centre of the base plate fixing hole Use the screw supplied to fix the stove in place Any voids around the stove must be In filled with vermiculite concret...

Page 11: ...hen filled and sealed once the installation is complete Alternatively a connection can be made using a register plate although it will be necessary to allow access for fitting the flue pipe to the reg...

Page 12: ...d it when in the closed position COMMISSIONING Upon completion of the installation allow a suitable period of time for any fire cement and mortar to dry out A small fire may then be lit and the instal...

Page 13: ...or unseasoned wood will create tar deposits in the stove and chimney increase harmful emissions and will not produce a satisfactory heat output Do not burn waste mineral fuel or treated or painted woo...

Page 14: ...he stove door Once the kindling is well alight open the door and build the fire by gradually adding slightly larger pieces of wood closing the door afterwards Once the fire is established close the Ig...

Page 15: ...can be replaced with new available from your dealer Air Valve Cassette this should be removed and cleaned monthly to remove any ash that may be in the controls N B Make sure that controls are in the...

Page 16: ...t may therefore be necessary to adjust the door catch to maintain the door seal To adjust the catch slacken the two set screws on the catch bar and adjust the position of the catch bar as necessary Ai...

Page 17: ...JINDLU04 Rev G 21 04 16 Stove Spares BODY SPARES...

Page 18: ...JINDLU04 Rev G 21 04 16 Stove Spares DOOR SPARES...

Page 19: ...JINDLU04 Rev G 21 04 16 Stove Spares AIR VALVE CASSETTE SPARES...

Reviews: