Assemble Ring to Base Stand
(for the 2.4 m & 2.7m)
You will have to assemble the 39” ring to the Ge-Mini base. Look at the photo of
the mount in Fig. #3, you will notice that the top of the mount has a bracket to
attach the elevation arm. The bottom of the 2” framework has two tabs. Insert a
½”x ¾” x ½” long brass bushing (found in the bolt bag) into each of the tabs.
Place the ring on the base stand, inserting the tabs (with the bushing) into the
double ear tabs. Secure with ½” x 2 ½” bolt, ½” lock washer & nut. Next install
the elevation actuator. Attach the gimball actuator clamp to the right side rear of
the 2” square tube with a ½” x 4 ½” bolt. Then take the eyebolt on the end of the
actuator and put it in between the top bracket of the frame work of the ring. Use a
½” x 2” bolt and use a lock washer and nut to secure it in place. This elevation
actuator will be used to precisely aim the dish to the satellite you are using.
PAGE 5
Please see the parts listed supplied to
help identify all parts for both the
Dual Powered Ge-Mini and the Fixed
Az-El Ge-mini. You will find these
drawings on the previous pages of
this instruction manual. Note the
Fixed Az-El Ge-Mini does not
include the motors or gears and
drives. These parts are only used for
the Dual Powered Ge-mini.
Fig. #3