background image

Mai
nt

ena
nce Man

ua

l D
G

-10

00T
 

Is

su

ed

: March

 200

 

ÄM1

000
-02
 

0.1

0

 

Gener

al 

0.

1

 

Manual am

endm

ents 

No
. Pag

Des
cript

ion
 

Dat

0.

3,

 0.

6,

 0.

10,
 1.

22

1.2
3, d

ia

gram
 15a 

TN1

000/
09

 Oct

ob

er 

2006
 

0.

5,

 0.

6,

 8.

2,

  

dia
gram

 15a 

Ä

M

 10
00

-1-
07

 

D

ecem
ber 

2006
 

0.

0,

 0.

3-

0.

6,

 0.

12

, 1.

1, 

3.

3,

 4.

2,

 4.

16,
 4.

17

4.

21

, 4.

28,
 8.

1,

 8.

dia
gram

s 5,
 6,

 8 - 
10

12,
 15,
 15
a,

  

5E
P5

0,

 5V
18,
 10FW

2,

 

en

cl

. 2

 page 1

 

TN1

000/
10

 

Manu

al

 revis

ion
 

Jan
uary

 

2007
 

0.

1,

 0.

6,

 d

ia

gram
 14 

T

N

100
0/1

Manu

al

 revis

ion
 

Octob

er 

2007
 

0.

3,

 0.

4,

 0.

6,

 0.

10,
 1.

9, 

1.

10

, 4.

7 – 
4.

dia
gram

s 17,

 18 

lan
din

g gear po

si

tive loc

kin

de

vic
e T
N

10

00

/13 

Febr

uary

 

2008
 

0.

3,

 0.

4,

 0.

6,

 0.

10,
 

1.

19

, 2.

1,

 d

iag

ram
 19,
 

enc
los
ure 3 

TN1

000/
15

  

T

hro

tt

le 

ha

nd

le i
n rea
r Coc

kp

it 

Op
ti

on

 

March

 20
08

0.

3,

 0.

6,

 0.

10,
 1.

14

 

dia
gram

 6a 

Ä

M

 10
00

-0

Fin 
ba

lla

st ta

nk

 va
lv

e and 

ha

nd

le 

March

 20
08

 

Mai
nt

ena
nce Man

ua

l D
G

-10

00T
 

Is

su

ed

: March

 200

 

ÄM1

000
/02
 

0.3

0.

2

 

List of eff

ect
ive pages 

Section 

 pa

ge 

is

sued 

replace

d/ replace

d/ replace

d/ 

0  

0.

Ju

ne 
20

05

 
Jan
uary

 20

07

 

 

 

 

0.

see m

anual am

endm

ent

 

 

  

0.

 

 

  

0.

 

 

  

0.

 

 

  

0.

 

 

  

0.

 

 

  

0.

Ju

ne 
20

05

 
Jan
uary

 20

07

 

 

 

 

0.

   

 

 

0.

   

  

0.1

Febr. 

20

08 

March 

20

08

 

 

 

 

0.

11

 

   

  

0.12

 

Ja

nu

ary
 2

007

 

 

 

 
 

    

1  

1.

Ju

ne 
20

05

 
Jan
uary

 20

07

 

 

 

 

1.

   

 

 

1.

   

 

 

1.

   

 

 

1.

   

 

 

1.

   

 

 

1.

   

 

 

1.

   

  

1.

Febr.

 2

008 

 

 

  

1.1

Febr. 

20

08 

 

 

 

 

1.

11

 

   

 

 

1.

12

 

   

 

 

1.

13

 

   

  

1.14

 

March

 20

08

 

 

 

 

 

1.

15

 

   

 

 

1.

16

 

   

 

 

1.

17

 

   

  

1.

18

 

   

  

1.

19

 

March

 20
08

 

 

 

  

1.

20

 

   

  

1.

21

 

   

  

1.

22

 

O

cto

ber 20

06

 

 

  

1.

23

 

O

cto

ber 20

06

 

 

  

1.

24

 

   

  

1.

25

 

   

 

Summary of Contents for DG-1000T

Page 1: ...vice TN1000 13 February 2008 6 0 3 0 4 0 6 0 10 1 19 2 1 diagram 19 enclosure 3 TN1000 15 Throttle handle in rear Cockpit Option March 2008 7 0 3 0 6 0 10 1 14 diagram 6a M 1000 02 Fin ballast tank va...

Page 2: ...ive pages continued diagram issued replaced replaced replaced 1 May 2004 2 Nov 2001 3 June 2005 4 Nov 2001 5 Nov 2001 January 2007 6 Nov 2001 January 2007 March 2008 Not valid for 10 101 and from 10 1...

Page 3: ...the undercarriage in the retracted overcentre locking position With TN1000 13 executed standard from ser no 10 133 on An additional landing gear positive locking device notch and latch at the landing...

Page 4: ...r adjusting the lock in the extended position see b by gluing slotted shims onto the stop sleeve of pushrod 5FW38 b In extended position landing gear struts over centre a max free play of ca 0 5 mm 0...

Page 5: ...dder cables for wear especially around the S tubes on the rudder pedals Worn rudder cables should be replaced see section 4 2 Check the sealing of the rudder see section 1 3 5 B Annual inspection and...

Page 6: ...l DG 1000T Issued February 2008 TN 1000 13 4 8 F Removal of the front fork 10Fw10 1 1 Remove the baggage compartment floor and the rear cover of the baggage compartment 2 Remove the main wheel see A 3...

Page 7: ...e shaft 10Fw15 3 left and 10Fw15 2 right to the fork 10Fw13 1 With TN1000 13 executed standard from ser no 10 133 on remove the locking catch lock for retracted position 9 Shift the shaft 10Fw15 3 tow...

Page 8: ...positive locking device diagram17 issued February 2008 TN1000 13 installation of the notch LG extended to 10FW12 2 Installation of the locking catch View LG retracted locking catch not engaged directi...

Page 9: ...upwards 4 Remove line 2 from the front cylinder To accomplish this press the black securing ring into the terminal nipple Push one50 ml syringe into the line 5 Remove line 2 from the rear cylinder Ins...

Page 10: ...fluid Move the cylinder into position 2 Connect the tube to the front terminal rear cylinder resp the upper terminal front cylinder Insert the other end of the tube into a container with hydraulic flu...

Reviews: