- 09 -
NOTE
:
When plugging in the DC cables, if AC already available,the Microinverter should
immediately blink red light and will start work within the setting time (default 60 seconds).
If AC is not available,the red light will blink 3 times quickly and repeat after one second
until AC is connected.
7.5
Microinverter System Operating Instructions
1. Turn ON the AC circuit breaker on each microinverter AC branch circuit.
2. Turn ON the main utility-grid AC circuit breaker. Your system will start producing
power after a one-minute waiting time.
To operate the microinverter PV system:
Summary of Contents for SUN1000G3-EU-230
Page 24: ......