- 35 -
Time of use:
it is used to program when to use grid or
generator to charge the ba�ery, and when to discharge
the ba�ery to power the load. Only �ck "Time Of Use"
then the follow items (Grid, charge, �me, power etc.)
will take effect.
Note:
when in selling first mode and click �me of use,
the ba�ery power can be sold into grid.
Gen charge:
u�lize diesel generator to charge the ba�ery
in a �me period.
Time:
real �me, range of 01:00-24:00.
Note:
when the grid is present, only the “�me of use”
is �cked, then the ba�ery will discharge. Otherwise,
the ba�ery won’t discharge even the ba�ery SOC is
full. But in the off-grid mode (when grid is not
available, inverter will work in the off-grid mode
automa�cally).
Power:
Max. discharge power of ba�ery allowed.
Ba�(V or SOC %):
ba�ery SOC % or voltage at when the
ac�on is to happen.
Time Of Use
Time
System Work Mode
Batt
Grid
Charge Gen
01:00
05:00
09:00
13:00
17:00
21:00
5:00
9:00
13:00
17:00
21:00
01:00
Power
12000
12000
12000
12000
12000
12000
160V
160V
160V
160V
160V
160V
Work
Mode2
For example
During 01:00-05:00,
if ba�ery SOC is lower than 80%, it will use grid to charge the
ba�ery un�l ba�ery SOC reaches 80%.
During 05:00-08:00,
if ba�ery SOC is higher than 40%, hybrid inverter will discharge
the ba�ery un�l the SOC reaches 40%. At the same �me,
if ba�ery SOC is lower than 40%, then grid will charge the
ba�ery SOC to 40%.
During 08:00-10:00,
if ba�ery SOC is higher than 40%, hybrid inverter will discharge
the ba�ery un�l the SOC reaches 40%.
During 10:00-15:00,
when ba�ery SOC is higher than 80%, hybrid inverter will
discharge the ba�ery un�l the SOC reaches 80%.
During 15:00-18:00,
when ba�ery SOC is higher than 40%, hybrid inverter will discharge
the ba�ery un�l the SOC reaches 40%.
During 18:00-01:00,
when ba�ery SOC is higher than 35%, hybrid inverter will discharge
the ba�ery un�l the SOC reaches 35%.
Solar Sell:
“Solar sell” is for Zero export to load or Zero export to CT: when this item is ac�ve, the surplus
energy can be sold back to grid. When it is ac�ve, PV Power source priority usage is as follows: load
consump�on and charge ba�ery and feed into grid.
Max. sell power:
Allowed the maximum output power to flow to grid
.
Zero-export Power:
for zero-export mode, it tells the grid output power. Recommend to set it as 20-100W
to ensure the hybrid inverter won' t feed power to grid.
Energy Pa�ern:
PV Power source priority.
Ba� First:
PV power is firstly used to charge the ba�ery and then used to power the load. If PV power is
insufficient, grid will make supplement for ba�ery and load simultaneously.
Load First:
PV power is firstly used to power the load and then used to charge the ba�ery. If PV power is
insufficient, Grid will provide power to load.
Max Solar Power:
allowed the maximum DC input power
.
Grid Peak-shaving:
when it is ac�ve, grid output power will be limited within the set value. If the load
power exceeds the allowed value, it will take PV energy and ba�ery as supplement. If s�ll can’t meet the
load requirement, grid power will increase to meet the load needs.
Gen Charge
Gen Signal
Gen Max Run Time
0.0 hours
Gen Down Time
0.5 hours
Battery Setting
Start
A
30%
37A
Batt
Set2
Time Of Use
Time
System Work Mode
Batt
Charge Gen
01:00
05:00
08:00
10:00
15:00
18:00
5:00
8:00
10:00
15:00
18:00
01:00
Power
80%
40%
40%
100%
40%
35%
Work
Mode2
12000
12000
12000
12000
12000
12000
Grid
②