
Page 9 of 24
Dewhot | Gas geyser manual
Dewhot | Gas geyser manual
Installation instructions
LOCATION
1. Long hot water pipes should be
insulated for water and
energy efficiency.
2. The gas geyser and water pipes should
be protected from
freezing temperatures.
3. When installing a gas geyser a minimum
of 1 meter is required from any
venting system.
IMPORTANT
Do not solder the HOT or COLD water
connections. If solder connections are
used, solder the fitting to the adapter
before fitting the adapter to the water
connections. Any heat applied to the
water supply fittings will permanently
damage the internal components of the
gas geyser.
MOUNTING THE GAS GEYSER
Install the appliance in a place that allows
for easy access.
At least 8mm concrete plugs and screws
should be used to mount the gas geyser to
the wall. In the case of dry walling use dry
wall anchors.
The gas geyser requires a 13 amp plug
point
WATER SUPPLY
This appliance must only be used with
the following water supply requirements:
1. Clean, potable water free of corrosive
chemicals, sand, dirt, or other
contaminants.
2. With inlet water temperatures above
0°C, but not exceeding 49°C
3. Free of lime and scale deposits
DO NOT reverse the hot and cold water
connections, this will not allow the gas
geyser to function.