
21
Pictures for illustra
Ɵ
ve purposes
only
E
LECTRO
V
AP
RTH-LC
Installation - Step 3
Three ventilation packs permit the use of the humidifier in direct in-space applications
where there is no ductworks.
The Blower Packs BP1 & BP2 can be set on the top of the RTH-LC 5 to 15 while a wall
setting is required for the models ranging up. The EHF III blower pack also requires to be
wall installed. The distance between the humidifier and the ventilation pack(s) should not
exceed 3m
A Ø 25 steam hose should be used for linking the blower pack to a RTH-LC 3 to 15 and a
Ø 40 for RTH-LC 20 & 30. A Ø 40/50 mm reductor must be used for connecting the EHF
III to the humidifier.
Allow a 3 m. distance ahead to the ventilation pack for a free diffusion of steam.
The electrical connection of the ventilation packs to the humidifier is via terminal block 3
& 4 on the DIN rail.
For use and installation of the Blower Pack ventilation units, please refer to the Blower
Pack technical manual available in English.
As far as the EHF-3 is concerned, please revert to the recommendations given on
the EHF-3 information sheet. Never connect the EHF-3 unit on the terminals 3 & 4
of the humidifier when a 100VA transformer is installed inside the ElectroVap RTH
humidifier.
Width Heigth Depth
Weight
Kg
dB
Kg/h maxi
output
m3/h Connecting
Ø
Compatible
with
BP1
260mm
170mm
285mm
2
40
5
80
Ø 25 mm
RTH-LC 3 to 5
BP2
260mm
170mm
285mm
2.6
48
15
320
Ø 25 mm
RTH-LC 7 to 15
EHF3
495mm
356mm
406mm
15
48
55
780
Ø 50 mm
RTH-LC 20 to 30
BP1 & BP2
EHF-3
TAKE CARE :
Attach hose on wall before connecting
it to Blower Pack.
0,50m mini
Steam distribution Y union
Ø60mm
-
2xØ40mm
(code: DIV0019)
Steam hoses should be
equally distant — X1=X2
1m mini