2.2
ELECTROSTATIC DISCHARGE
CAUTION
FURNACE RELIABILITY HAZARD
Failure to follow this caution may result in unit
component damage. Electrostatic discharge can
affect electronic components. Take precautions
during furnace installation and servicing to
protect the furnace electronic control.
These
precautions will help to avoid exposing the control
to electrostatic discharge by putting the furnace,
the controls, and the technician at the same
electrostatic potential.
2.3
LOCATION
This furnace must :
• Be installed so the electrical components are
protected from water;
• Not be installed directly on any combustible
material other than wood flooring;
• Be located close to the chimney or vent and
attached to an air distribution system.
Refer to
section 8.
• Be provided ample space for servicing and
cleaning. Always comply with minimum clearances
shown in table 2 or on the furnace rating label.
• The furnace must be installed in a conditioned
space.
Place the unit so that proper venting can be achieved,
with a minimum number of elbows, in accordance with
the instructions in this manual. The furnace should be
located as close to the chimney (vertical venting) or to
the outside vent wall (horizontal venting) as possible.
2.3.1
Location relative to cooling
equipement
The cooling coil can either be installed in the supply air
duct or in the return air duct. If the coil is installed in the
supply air duct, it must be at a minimum of 6” over the
furnace primary heat exchanger.
Table 2 – Minimum clearance
Position
Clearance in (mm)
Rear
0
Front
24 (610)
All sides of supply plenum
1 (25)
Right side
1
8 (204)
Other Sides
0
Vent
0
Top of furnace Chinook compact
0
1
This side needs to be removed for service
3
ALIZÉ COOLING UNIT
To optimize your HVAC experience, Dettson offers the
Alize heat pump system. Your furnace can deliver up to
400 CFM, making it suitable for a cooling unit up to 12000
BTU.
3.1
POSITION OF THE INTERFACE
BOARD - ALIZE SYSTEM
Provision has been made on the main control board
support in the furnace to locate the interface board
(K03081). Refer to figure 1.
Figure 1 – Interface card position
4
INSTALLATION
The furnace is factory built for upflow position. When
installing the furnace in other orientation than the upflow
position, simply re-route the tubing accordingly with the
instructions provided in this section of the manual.
8
Summary of Contents for CC15-M-V
Page 18: ...Figure 17 Wiring Diagram 18...
Page 23: ...Figure 25 Direct vent clearance 23...
Page 24: ...Figure 26 Other than Direct vent clearance 24...
Page 34: ...12 PART LIST Figure 27 Exploded view...
Page 35: ...Figure 28 Exploded view continued...
Page 36: ...Table 19 Part list Chinook Compact...
Page 37: ...Table 20 Part list continued...
Page 38: ...13 NOTES 38...
Page 39: ...39...
Page 40: ...40...