![Detroit Radiant Products ACS-40N-120V Manual Download Page 16](http://html1.mh-extra.com/html/detroit-radiant-products/acs-40n-120v/acs-40n-120v_manual_2488069016.webp)
Heater Suspension
The suspension of the heater must conform to all applicable codes referenced in the Safety section and
these instructions. To ensure proper operation, the heater must be installed in a level horizontal position.
1
Locate brooders approximately 25 to 40 ft. (8 to 12m) apart, in a row, as needed for bird comfort and
building heat loss. If more than one row is desired, stagger rows for best heat distribution. Attach the
chain kit (sold separately) to the top of the brooder canopy.
2
Suspend the brooder at the desired height above the floor (litter) level; normally 60 to 72 inches
(152.4 cm to 182.8 cm). For brooders connected to a winch (to allow adjustment of brooder height),
connect each chain kit (sold separately) using a chain or cable suitable for the weight of each brooder.
DO NOT USE ROPE.
Size the winch and cable so that it is capable of handling the total weight of all
brooders and gas piping involved.
NOTE:
Connect a safety chain to each brooder and anchor it to the house structure above each brooder
to prevent it from falling onto the litter if the cable/chain breaks or the winch falls.
THE GAS HOSE
SHOULD NEVER BE USED AS A SAFETY CHAIN.
3
Connect the gas line and electrical supply (if required) to each brooder as outlined on pages 17 and 26.
WARNING
!
Improper suspension of the brooder may result in collapse and being crushed. Always
suspend from a permanent part of the building structure that can evenly support the total
force and weight of the unit.
ACS
Series
16
3.0
Installation
•
Heater Suspension
NOTICE
Ensure that the brooder is suspended with the control box side approximately 1/2” (13 mm) lower than
the opposing side of the brooder. Failure to follow these instructions could result in damage to the gas
control valve, circuit board, and/or control box.