![DETAIL K2 OPG777(G) Assembly Manual Download Page 4](http://html1.mh-extra.com/html/detail-k2/opg777-g/opg777-g_assembly-manual_2487537004.webp)
4 | OPG777(G) man.
ASSEMBLY
CHECK THE PACKAGING
STEP 1: INSPECT THE PACKAGING
Open and unpack all items. Leave lots of working space. Inspect all parts.
The Stump Grinder is shipped in a crate. Leave the sides folded down and use as your work
space.
NOTE: Upon inspection of parts, if you find any damage or missing parts please call DK2
POWER at 1 (888) 277-6960 or contact us via our website at www.detailk2.com. We will
replace any damaged or missing parts to you for free. Please do not return to the store.
ENGLISH
Summary of Contents for OPG777(G)
Page 3: ...SECTION I ASSEMBLY...
Page 10: ...SECTION II SAFETY OPERATION...
Page 15: ...SECTION III PARTS SCHEMATICS...
Page 21: ...SECTION I MONTAGE...
Page 28: ...SECTION II S CURIT ET FONCTIONNEMENT...
Page 34: ...SECTION III PI CES SCH MAS...