
Document:
DS-M8--OPM-1.0M
Page 13 of 19
© DESAY INTELLIGENT CO. LTD.
T
+752 2617 333
WWW.DESAYOPTO.COM
3.1.2 Stacking Installation
Before starting make sure that the surface, on which the screen
is to be build, is strong enough to hold all the weight, including
counterweights.
Consult for maximum height of screen in
next section.
Procedure for stacking installation:
1
Place the base with the one or two short skis. If
necessary you can place an extension ski locked onto a short ski.
Lock the connection screws of the skis onto the bases and level
out with the adjustable feet. Do this for all bases and lock these
together and level out.
2
Place the first row of panel onto the base and lock.
3
Lock the panels horizontally together.
4
Place and lock the next row(s) onto the panels and also
lock horizontally.
5
Depending on the height of the total screen you now lock
a double (two panels high) or triple stacker (three panels high)
onto the panels.
6
Continue this procedure for all the rows. Make sure to
lock firmly and the stackers must be lock onto each other.
Safety while in use:
When dismounting the screen care must be taken that the
horizontal locking is undone before attempting to hoist the
panels.
Truss
Stacking
Base