background image

                                                                                                        - 5 -                                          

For more information, visit www.desatech.com

 

FRAMING AND INSTALLING THE FIREPLACE 

 
STEP 1: Frame the opening for the fireplace using the 
dimensions shown in figures 1 & 2. 
 
STEP 2: If the fireplace is to be installed directly on carpeting, 
tile (other than ceramic), or any combustible material other 
than wood flooring, the fireplace must be installed upon a 
metal or wood panel extending the full width and depth of the 
fireplace. 
 
STEP 3:  Set the fireplace directly in front of this opening and 
slide the unit back until the nailing flanges touch the side 
framing. 
 
STEP 4: Check the level of the fireplace and shim with sheet 
metal if necessary. 
 
STEP 5: Before securing fireplace to prepared framing, the 
ember protector (provided), must be placed between the hearth 
extension (not supplied), and under the bottom front edge of 
the fireplace to protect against glowing embers falling 
through.  If the fireplace is to be installed on a raised platform, 
a Z-type ember protector (not supplied) must be fabricated to 
fit your required platform height.  The ember protector should 
extend under the fireplace a minimum of 1 - 1/2”.  The ember 
protector should be made of galvanized sheet metal (28-gage 
minimum) to prevent corrosion. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

STEP 6: Using screws or nails, secure the fireplace to the 
framing through flanges located on the sides of the fireplace.  
 
 

HEARTH EXTENSION 

 
A hearth extension projecting a minimum of 20” in front of 
and a minimum of 12” beyond each side of the fireplace 
opening is required to protect combustible floor construction 
in front of the fireplace.  Fabricate a hearth extension using a 
material which meets the following specifications: a layer of 
non-combustible, inorganic material having a thermal 
conductivity of K = 0.84 BTU IN/FT. HR. F (or less) at 1” 
thick.  For example, if the material selected has a K factor of 
0.25, such as glass fiber, the following formula would apply: 
 
 
 
 
 
 
Thermal conductivity “K” of materials can be obtained from 
the manufacturer or supplier of the non-combustible material.  
 If the hearth extension is to be covered, use non-combustible 
material such as tile, slate, brick, concrete, metal, glass, 
marble, stone etc.  Provide a means to prevent the hearth 
extension from shifting and seal gap between the fireplace 
frame and hearth extension with a non--combustible material 
(see figure 3). 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

WARNING:

 Hearth extension is to be installed only 

as illustrated. 

0.25 x 1.0” = 0.30 thickness required

 

     0.84 

 

Figure 3               HEARTH EXTENSION 

 

Figure 1         FRAMING DIMENSION 

 

Figure 2          CORNER INSTALLATION 

Summary of Contents for (V)GM36

Page 1: ...lace or for use with a vented gas log approved to ANS Z21 60 Z21 84 or RGA 2 72 standards or for use with a vent free gas log heater approved to ANS Z21 11 2 standard WARNING Always leave glass doors...

Page 2: ...LINEAL GAIN PG 6 8 CHIMNEY PIPE AND OFFSET INSTALLATION PG 6 7 9 FIRESTOP SPACERS PG 7 10 FLASHING AND TERMINATION PG 8 9 11 MANTEL CLEARANCE PG 9 10 12 FINISHING YOUR FIREPLACE PG 10 13 OPTIONAL GLA...

Page 3: ...1 For more information visit www desatech com SPECIFICATIONS 50 MODEL ALL DIMENSIONS IN THIS MANUAL ARE IN INCHES UNLESS OTHERWISE SPECIFIED...

Page 4: ...2 For more information visit www desatech com SPECIFICATIONS 42 MODEL ALL DIMENSIONS IN THIS MANUAL ARE IN INCHES UNLESS OTHERWISE SPECIFIED...

Page 5: ...3 For more information visit www desatech com SPECIFICATIONS 36 MODEL ALL DIMENSIONS IN THIS MANUAL ARE IN INCHES UNLESS OTHERWISE SPECIFIED...

Page 6: ...12 GM36 Top Spacers 0 minimum Mantel Clearances see page 8 Mantels Chimney Outer Pipe Surfaces 2 minimum 1 GM36 MINIMUM MAXIMUM CHIMNEY HEIGHT The minimum height of the chimney measured from the base...

Page 7: ...e of galvanized sheet metal 28 gage minimum to prevent corrosion STEP 6 Using screws or nails secure the fireplace to the framing through flanges located on the sides of the fireplace HEARTH EXTENSION...

Page 8: ...aking sure that both the inner and outer pipe sections are locked together When installing double wall snap lock chimney together it is important to assure the joint between the chimney sections is lo...

Page 9: ...e complete separation from one floor space to another or attic space as required by most codes When the double wall pipe passes through a framed opening into an attic space the firestop must be placed...

Page 10: ...ing chart Slide flashing over pipe until base is flat against roof Replace as many shingles as needed to cover exposed area and flashing base Secure in position by nailing through shingles see figure...

Page 11: ...d must be at least 2 feet above the highest point of the roof that is within a horizontal distance of 10 feet see figure 16 MANTELS A mantel may be installed if desired see figure 17 Woodwork such as...

Page 12: ...evenly The tempered glass will withstand a gradual temperature rise to 550 degrees Fahrenheit which is more than a normal fire will generate Such materials as pitch wax laden logs very dry mill end l...

Page 13: ...ement or commercial furnace cement Install the gas appliance or cap off gas line if desired If you install a decorative gas appliance vented gas log the decorative gas appliance must comply with the S...

Page 14: ...r up will free the outside air door to open Pulling the lever down will lock the door close FOR FURTHER OPERATING GUIDELINES INSTRUCTIONS AND WARRANTY INFORMATION PLEASE REFER TO YOUR HOMEOWNERS GUIDE...

Page 15: ...ce NOTE The left and right panels have identical bricks See instruction on page 19 before installing brick S NOTE INSTALLATION OF BRICK SHOULD BE DONE AFTER THE FIREPLACE IS PLACED IN A PERMANENT LOCA...

Page 16: ...e bricks in this sequence NOTE The left and right panels have identical bricks See section on page 19 before installing brick S NOTE INSTALLATION OF BRICK SHOULD BE DONE AFTER THE FIREPLACE IS PLACED...

Page 17: ...ortant to install the bricks in this sequence NOTE The left and right panels have identical bricks See section on page 19 before installing brick S NOTE INSTALLATION OF BRICK SHOULD BE DONE AFTER THE...

Page 18: ...9 3 3 3 3 1 1 TOTAL 37 6 6 6 6 6 6 0 0 0 0 4 4 0 0 2 0 3 BRICK MATRIX R S T U V W X Y Z AA AB AC AD AE AF AG AH AI BOX 1 HEARTH 42 2 2 2 2 2 2 BOX 2 REAR 42 2 BOX 3 LEFT or RIGHT 42 1 1 BOX 3 LEFT or...

Page 19: ...ULD BE DONE AFTER THE FIREPLACE IS PLACED IN A PERMANENT LOCATION HM HZ HO HJ HJ HJ HR HG HG HI HI HN HEARTH PANEL FULL FULL FULL FULL FULL FULL FULL FULL FULL FULL FULL FULL HL HL HL HL HL HL HAAF HA...

Page 20: ...or right panel It is important to install the bricks in this sequence NOTE INSTALLATION OF BRICK SHOULD BE DONE AFTER THE FIREPLACE IS PLACED IN A PERMANENT LOCATION HL HL HL HL HL HAAF HAAF HAAF HAAF...

Page 21: ...NOTE INSTALLATION OF BRICK SHOULD BE DONE AFTER THE FIREPLACE IS PLACED IN A PERMANENT LOCATION HL HXX HAAH HVV HAAH HAAH HAAH HVV HVV HWW HAAG HAAF HAAF HAAF HF HJ HF HF HF HE HAAG FULL FULL FULL HL...

Page 22: ...32 3 3 5 3 1 8 1 6 12 1 9 BRICK MATRIX HM HN HO HZ HAA HBB HCC HDD HEE HFF HGG HHH BOX 1 HEARTH 42 1 1 1 1 1 1 BOX 2 REAR 42 1 1 BOX 3 LEFT 42 1 1 1 BOX 4 RIGHT 42 TOTAL 1 1 1 1 1 1 1 1 0 1 1 1 BRICK...

Page 23: ...k firmly into the brick housing until it snaps The groove line on the side of the brick will come in contact with the flange on the brick housing This secures the brick into the housing INSTALLING BRI...

Page 24: ...xture that might have gotten onto the brick will easily wipe off 2 In a heavy duty mixing bucket pour seven 7 cups of water in first then add in 4 5 lbs half of one bag provided of sand and 4 5 lbs of...

Page 25: ...e joint should now be flush with the brick surface 8 Using a Joint Striker force the grout mixture into the joint and sweep back and forth until the grout is smooth and round If when pressing the grou...

Page 26: ...re using flat head screws provided INSTALLING DOOR FRAME To install glass door frame construct an opening see table below on the front face of the fireplace Insert door frame into face opening and tig...

Page 27: ...top pins slide into door track Door is installed when top door pin snaps into spring clip Repeat step for remaining door If you find the doors do not close properly or do not appear level or straight...

Page 28: ...26 For more information visit www desatech com REPLACEMENT AND ACCESSORY PARTS...

Reviews: