www.desatech.com
113084-01J
9
6"
Minimum
48"
Minimum
Ceiling
Floor
Back
Wall
INSTALLATION
Continued
Figure 4 - Minimum Clearance to Walls
and Ceiling (Stove May Vary Depending
on Model)
Top View
Side
View
12"
Minimum
12"
Minimum
48"
Minimum
Ceiling
Side
Wall
Side
Wall
Back Wall
Side Wall
Side Wall
12 "
Minimum
12 "
Minimum
6 "
Minimum
Corner
Wall
Wall
6 "
Minimum
6 "
Minimum
Front of
Stove Unit
Front
View
STOVE cAVITY ASSEMBLY
1. Lift off corrugated box enclosing stove
body crating.
2. Remove all screws fastening wood frame
enclosure. Spread wood frame open and
lift away from plastic-bagged stove body.
The bottom pieces of pallet wood will
remain bolted to stove body.
3. Remove plastic bag from stove body.
4. Remove all contents from inside stove
cavity. Contents include:
(4) - Legs (include leg leveler bolts)
(1) - Bottom door
(3) - Top grates
(1) - Hardware kit bag with fasteners
5. Carefully lay stove body on back to attach
bottom components to stove body (see
Figure 5). Rest stove on drop cloth or
blanket to avoid scratching stove edges.
6. Remove remaining pallet wood attached
to bottom of stove body (see Figure 6).
Use an adjustable wrench or 12 mm
socket to remove bolts.
7. Fasten each leg to stove with four M8
x 1.25 - 20 mm bolts. Use a flat washer
and lock washer with each bolt. Tighten
bolts into threaded holes on stove body
(see Figures 7 and 8, page 10). Use an
adjustable wrench or a 12 mm socket.
Figure 5 - Laying Down Stove On Side
(Stove Style May Vary Depending on
Model)
Front of
Stove
Unit
Drop
Cloth/
Blanket
Pallet Wood Bolted to
Stove Body Bottom
Top of
Stove Unit
Front of
Stove Unit
Top of
Stove
Unit
Figure 6 - Removing Pallet Wood From
the Bottom of the Stove
Pallet Wood
Bolt
Pallet
Wood
Bottom
Of Stove
Unit
Front
Front of
Stove Unit