background image

www.desatech.com

118116-01D

14

BRICK INSTALLATION 

Continued

INSTALLING Z-SHAPED GRATE 
RETAINER BRACKET

%HIRUH JURXWLQJ EULFNV ORFDWH WKH ]VKDSHG

grate retainer brackets on top of hearth bricks 
as  shown  in  Figure  21.  Position  retainer 
brackets at 8 

3

/

4

" apart from center to center 

of notch.

Figure 21 - Installing Grate Retainer 

Bracket

GROUTING INSTRUCTIONS

Material provided:
2 - 10 lb. bags of cement
2 - 10 lb. bags of sand
Material required:
1 - Piping bag
1 - Joints striker
1 - Heavy duty mixing bucket
1 - Trowel
1.  Moisten brick surface with damp sponge 

or  spray  bottle  just  prior  to  application. 
When  bricks  are  wet,  any  excess  grout 
mixture on bricks will easily wipe off.

2.  In a heavy duty mixing bucket, pour seven 

(7) cups of water. Add 5 lbs. (half of a bag) 
of sand and 5 lbs (half of a bag) of cement. 
Mix together thoroughly using a power drill 
with mixing wand attachment.

3.  The  overall  length  of  piping  bag  should 

be about 16". If bag is longer than 16", 

FXWLWGRZQWRVL]HE\UHPRYLQJHQGZLWK

larger opening. This will make bag easier 
to handle.

4.  Put 2 to 3 cups of grout mixture into pip-

ing bag making sure smaller opening is 
downward and over a moist towel to avoid 

Figure 22 - Grouting Brick

spilling.  Place  a  wet  towel  over  bucket 
making sure it is directly on the surface of 
grout mixture. This will keep mixture moist 
and it will not dry out before use.

5.  Begin  grouting  by  first  doing  a  “Filler 

3DVV´7KLVLVGRQHE\¿OOLQJWKHMRLQWDERXW

3/4 full with grout mixture. It is important 
to  work  with  only  6  bricks  at  a  time  so 

JURXWGRHVQWKDYHWLPHWRVHWXSEHIRUH

striking.

6.  Complete  a  “Finishing  Pass”  around  6 

EULFNV\RXMXVWSXW¿OOHUSDVVDURXQG7KLV
LV GRQH E\ VORZO\ ¿OOLQJ LQ UHPDLQGHU RI

joint with a thick amount of grout mixture. 
Mixture should be a little higher than the 
brick surface.

7.  Using a trowel, remove excess grout mix-

ture by moving trowel in the direction of 
the joint. Grout mixture in the joint should 

QRZEHÀXVKZLWKEULFNVXUIDFH

8.  Using a joint striker, force grout mixture 

into  joint  and  sweep  back  and  forth 
until grout is smooth and round. If grout 
becomes  too  shallow,  add  more  grout 
mixture with piping bag and strike again.

9.  Continue procedure around each group of 

EULFNVXQWLODQHQWLUHSDQHOLV¿QLVKHG

10. Using trowel, scrape in direction of joints 

to remove any grout that may have col-
lected  around  bricks  during  striking.  If 
desired, take a moist sponge and lightly 
sweep  over  bricks  to  remove  any  grout 
that may have gotten on bricks. DO NO 
PRESS HARD OR RUB IN A CIRCULAR 
MOTION. This will press grout into brick 
and turn brick a different color.

Allow 72 hours before 

RSHUDWLQJ¿UHSODFH

Summary of Contents for F48H

Page 1: ...YHQWHG JDV ORJ DSSURYHG WR ANS Z21 60 Z21 84 or RGA 2 72 standards or for use with a vent free gas log heater approved toANS Z21 11 2 standard 7KLV ZRRG EXUQLQJ UHSODFH FRPSOLHV ZLWK 8 CAN ULS S610 M8...

Page 2: ...re beginning the installation of the fireplace read these instructions through completely 7KLV 6 HDWLQJ UHSODFH DQG LWV components are safe when installed accord ing to this installation manual Unless...

Page 3: ...Straps Provided Hearth Spacer Required for Combustible Floor 0 to Bottom 12 Min Each Side Hearth Extension 72 X 20 Outside Air Access Location 1 5 Airspace Back and Sides 2 Chimney Airspace Clearance...

Page 4: ...per clear ances see Figures 1 and 2 RQVLGHU D ORFDWLRQ ZKHUH WKH UHSODFH will not be affected by drafts air condition ing ducts windows or doors 3 A location that avoids the cutting of joists or roof...

Page 5: ...Fireplace Front Elevated Ember Protector Ember Protector Seal Gap Hearth Extension 51 1 HDUWK H WHQVLRQ is to be installed only as shown in Figure 3 MANTELS A mantel may be installed if desired see F...

Page 6: ...ined above making sure that both inner and outer pipe sections are locked together When installing double wall snap lock chim ney together it is important to assure the joint between chimney sections...

Page 7: ...sts on return elbow Straps must be securely nailed to rafters or joists see Figure 8 details A and B 3 Maximum length of pipe between supports UHWXUQ HOERZ RU 6 0 LV RI DQJOH UXQ 0D LPXP RI WZR DQJOH...

Page 8: ...Min of 8 PENETRATING THE ROOF To maintain a 2 clearance to the pipe on a roof with a pitch a rectangular opening must be cut 1 Determine center point through which pipe will penetrate roof 2 Determine...

Page 9: ...e Figure 14 Apply waterproof caulk around perimeter of collar to provide a proper seal Figure 14 Storm Collar Chimney Pipe Waterproof Caulk Storm Collar Flashing Terminations Spark Arrestor 7KH UHSODF...

Page 10: ...10 Foot Rule Seal Opening with Refractory Cement Outside of Fireplace Gas Line Conduit Repack Insulation Incoming 1 2 Black Iron Pipe Side Firebrick Finished Side Provide Enough Threaded End for Fitt...

Page 11: ...l ignite if heavily heated WARNING When using a decorative vented gas log the damper must be removed or permanently locked in the fully open position and the glass doors must be in the fully open posi...

Page 12: ...F U L L F U L L F U L L F U L L F U L L F U L L F U L L F U L L F U L L F U L L F U L L F U L L F U L L F U L L F U L L F U L L F U L L F U L L F U L L F U L L F U L L F U L L F U L L F U L L F U L L...

Page 13: ...3 1 1 1 1 1 1 1 1 Box 5 Right 1 1 1 TOTAL 1 1 1 3 1 1 1 1 1 1 1 1 HERRINGBONE BRICK MATRIX BRICK MATRIX Continued BRICK MATRIX PAN PAO PAP PB PC PD PE PF PG PH PJ PK Box 1 Hearth Box 2 Rear Lower 8 2...

Page 14: ...towel over bucket making sure it is directly on the surface of grout mixture This will keep mixture moist and it will not dry out before use 5 Begin grouting by first doing a Filler 3DVV 7KLV LV GRQH...

Page 15: ...op door rail Door is installed when top door pin snaps into spring clip see Figure 25 page 16 2 Repeat step 1 for remaining door I RX QG GRRUV GR QRW FORVH SURSHUO RU GR not appear level or straight p...

Page 16: ...GRRUV RSHU DWHV PXFK GLIIHUHQWO WKDQ D UHSODFH ZLWK DQ RSHQ IURQW UHSODFH ZLWK JODVV GRRUV KDV D limited amount of air for combustion FHVVLYH KHDW ZLWKLQ UHSODFH FDQ UHVXOW LI WRR ODUJH D UH LV EXLOW...

Page 17: ...r unvented room heaters ANSI Z21 11 2 are WR EH LQVWDOOHG LQ WKLV UHSODFH DAMPER HANDLE OPERATION The damper handle opens and closes the damper blade and is located in the upper rear VLGH RI UHSODFH M...

Page 18: ...DM 24 12DM 36 12DM 48 12DM 12 12HT 18 12HT 24 12HT 36 12HT and 48 12HT 30 OFFSET AND RETURN 30E 12DM and 30E 12HT GRATE 109496 01 Model GM50 EMBER PROTECTOR EP36 OPTIONAL OUTSIDE AIR KIT FOR FLOOR INS...

Page 19: ...ERVICE OPTIONAL ASH LIP KIT BRICKS AL48 OPTIONAL HEARTH SPACER HS48 24 ROUND WOODNOOK DHR 24 You may have further questions about installa tion operation or troubleshooting If so con tact DESA Heating...

Page 20: ...NOT A UPC 118116 01 Rev D 10 07 118116 01 DESA Heating LLC 2701 Industrial Drive P O Box 90004 Bowling Green KY 42102 9004 www desatech com 1 866 672 6040...

Reviews: