
Disconnect the fuel pump connector. Start the en-
gine and wait for it to stop. With the wiring con-
nected to the control unit and the system, try to
start-up the engine and check that the alternating
voltage between pins 13 and 15 is over 2.5 V ~
With the interface cabling disconnected from the
control unit, check the continuity of the rpm sensor
connector red cable between pin 13 and pin 1 and
the rpm sensor connector white cable between pin
15 and pin 2
With the interface wiring disconnected from the
control unit and the rpm sensor connector also
disconnected, check that the red and brown cables
(pin 13 - 15) are insulated from each other and in-
sulated from the earth connection.
Specific tooling
AP8181059
Control unit interface wiring
*
Digital multimeter
Injection
INJEC - 173
Summary of Contents for Rambla 250
Page 1: ...WORKSHOP MANUAL RAMBLA 250 ...
Page 2: ......
Page 4: ......
Page 6: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Page 23: ...INDEX OF TOPICS TOOLING TOOL ...
Page 31: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 48: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL ...
Page 50: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 51: ...KEY Electrical system ELE SYS 51 ...
Page 73: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 79: ...INDEX OF TOPICS ENGINE ENG ...
Page 133: ...Lubrication Conceptual diagrams LUBRICATION CIRCUIT Engine ENG 133 ...
Page 134: ...Engine ENG 134 ...
Page 143: ...INDEX OF TOPICS INJECTION INJEC ...
Page 171: ...Components location Injection INJEC 171 ...
Page 187: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 209: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 219: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Page 226: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 237: ...Chassis CHAS 237 ...
Page 252: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 258: ...T Tank 244 248 Technical data Transmission 13 80 93 Turn indicators 66 Tyres 15 ...
Page 259: ......