
Rev. F, December 2020
Pro-Wedge VM-20 Operator’s Manual
Page iv
8.3
Setting Weld Speed………………………………………………….Page 17
8.4
Starting a Weld………………………………………………………Page 19
8.5
Ending a Weld……………………………………………………….Page 19
8.6
Shut-Down…………………………………………………………..Page 19
9
REFERENCE DOCUMENTS……………………………………………...PAGE 20
9.1
Appendix A, Pro-Wedge Welding Speed / Temperature Chart……..Page 21
9.2
Appendix B, Pro-Wedge Speed Setting Versus Travel Rate Chart…Page 22
9.3
Appendix C, Pro-Wedge Lid Wiring Schematic (Parts ID)………..Page 23
9.4
Pro-Wedge Lid Wiring Schematic (Parts List)…………………….Page 24
9.5
Appendix D, Pro-Wedge Box Wiring Schematic (Parts ID)………...Page 25
9.6
Pro-Wedge Box Wiring Schematic (Parts List)……………………...Page 26
9.7
Appendix E, Warranty……………………………………………….Page 27