![Demco 365 WAGON Operator'S Manual Download Page 3](http://html1.mh-extra.com/html/demco/365-wagon/365-wagon_operators-manual_2479740003.webp)
AG20003
Page 3
iNtRoDUCtioN
GENERAl iNFoRMAtioN
1. Unless otherwise specified, high-strength (grade5)
(3 radial-line head markings) hex head bolts are
used throughout assembly of this piece of equip-
ment.
2. Whenever terms
“LEFT”
and
“RIGHT”
are used
in this manual it means from a position behind
wagon box and facing forward.
3. When placing a parts order, refer to this manual
for proper part numbers and place order by
PART
NO. and DESCRIPTION.
4. Read assembly instructions carefully. Study
assembly procedures and all illustrations before
you begin assembly. Note which parts are used in
each step. This unit must be assembled in proper
sequence or complications will result.
Warranty Policy & Registration .................................................................................................. 2
General Information & Warranty Policy & Registration .......................................................... 3
Safety, Signal Words .................................................................................................................. 4
Equipment Safety Guidelines, Lighting and Marking ............................................................ 5
Safety Sign Care ......................................................................................................................... 5
Tire Safety .................................................................................................................................... 6
Before Operation ....................................................................................................................... 6
During Operation ......................................................................................................................6-7
Following Operation .................................................................................................................. 7
Highway and Transport Operations ........................................................................................7-8
Performing Maintenance ........................................................................................................... 8
Safety Sign Locations ................................................................................................................. 9
Bolt Torque ................................................................................................................................. 10
Running Gear Parts List and Breakdown ................................................................................ 11
Gravity Flow Box Parts Breakdown .......................................................................................... 12
Gravity Flow Box Parts List and Assembly Instructions ......................................................... 13
365 Bushel Box with 12 Ton HD Rocking Bolster .................................................................. 14
Gravity Flow Box Light Kit with Parts List and Instructions ................................................... 15
Window Installation Procedure and Parts List ....................................................................... 16
tABlE oF CoNtENtS