5
ASSEMBLY INSTRUCTIONS
BEFORE INSTALLATION
Turn off power source. Review all safety precautions.
.
1
d
n
a
s
e
e
r
g
e
d
0
9
o
t
t
u
o
s
b
a
t
g
n
i
s
u
o
h
e
h
t
d
n
e
b
o
T
make housing tabs contact the bottom of the joist.
.
2
3. Sliding suspension brackets available to allow
for your specific positioning of housing anywhere
between joists and span up to 24”.
NEW CONSTRUCTION
Joist
MOUNT HOUSING WITH FLANGE:
USING SUSPENSION BRACKETS
4.
Extend suspension brackets to the width of the
joists. Make sure the fan body is level and
perpendicular with the joist, and flush with
ceiling surface.
Fasten suspension brackets to joists with
long wood screws .
Secure suspension brackets together with
machine screws
A.
B.
C.
4
Model:
GBR100LED-DECOR
The housing mounts with 4 long screws (ø 4×25).
Screw housing to joist through lowest holes in
each mounting flange, then through the other
holes.
Tabs
Joist
2
Long Wood Screws
3
Channel
Suspension Bracket
11
Joist
Joist
Machine Screws
Long Wood Screws
Summary of Contents for Breez GreenBuilder GBR100LED-DECOR
Page 12: ...12 Model GBR100LED DECOR...