14
Quick installation guide for RPI H3 inverters
Commissioning - basic settings
11
To execute commissioning, the inverter needs to be pow-
ered either by AC (the grid) or DC (the solar modules)
$IWHUSRZHULQJXSWKHLQYHUWHUIRUWKH¿UVWWLPHWKH
inverter enters the commissioning mode and the
Select
language
dialog is shown.
N e x t / E n t e r
U K G 8 3 - 2
1.
Use the button
SEL
to select your country or grid.
7RFRQ¿UP\RXUVHOHFWLRQSUHVVWKHEXWWRQ
ENT
.
N / Y
E x i t ?
2.
7R¿QLVKWKHFRXQWU\VHOHFWLRQSUHVVWKHEXWWRQ
ENT
.
To select another country or grid, press the button
SEL
and repeat step 1.
;
7KHEDVLFVHWXSLV¿QLVKHG7KHPDLQPHQXLVVKRZQ
3 . 0 k V A
I n v e r t e r
Setting the inverter ID
If your PV plant contains multiple inverters, for each of the inverters a different inverter ID has to be set.
The inverter ID is needed to identify each inverter via RS485. For a description of the RS485 connection,
see
“Connecting to a datalogger via RS485 (optional)”, p. 12
.
I D : 1
I n v e r t e r
1.
In the main menu, use the button
SEL
to select
Inverter ID
.
2.
Press the buttons
SEL
and
ENT
at the same time and hold them for at least 3 seconds.
ĺ
The menu to change the inverter ID is shown.
I D = 1 ?
S e t t i n g I D :
I D = 2 ?
S e t t i n g I D :
3.
Use the button
SEL
to change the inverter ID.
4.
7RFRQ¿UPWKHYDOXHSUHVVWKHEXWWRQ
ENT
.
ĺ
The new inverter ID is shown in the main menu.
I D : 2
I n v e r t e r
Commissioning - Further settings (optional)
12
RPI_H3_QIG_V1.0_EU_EN_2015-05-11.indd 14
15.05.15 11:31