Delta Elektronika SM 120-25 D Manual Download Page 12

SM3000

DELTA ELEKTRONIKA BV

1991, rev. May 2008

OPERATING  MAINTENANCE  TROUBLE SHOOTING  CALIBRATING

Page 4 - 1

OPERATING MANUAL

1)

OPERATING THE UNIT FOR THE FIRST TIME 

Check that there is no condensation on the unit. If there is, al low
some time to dry.

Set the pro gram switches on the rear panel on MAN UAL.

Check that there is a link be tween + and S+ and be tween – and
S– on the SENSE BLOCK (on rear panel)

Set OVP po tentiometer (on front panel) to max imum (fully clock-
wise), Use a screwdriver to set the OVP volt age.

With

high out put current

make sure to use low resistive con -

nections be tween the power sup ply and the load:

- Mount the ca ble lugs di rectly on the tinned output strips
  fol lowed by a washer and a nut (see fig. 4 - 1). Al ways in 
  this or der!
- Never place ex tra wash ers be tween the lugs and the strips!
- Only use nuts and wash ers sup plied with the unit.

Switch on unit.

Turn both the CV and CC po tentiometer a few turns clock wise. A
voltage should now be pres ent on the output.

By pressing the DISPLAY CV/CC SETTING button the meters
will show the setting of the CV and CC po tentiometer.

By press ing the DIS PLAY OVP SETTING button the volt me ter
will show the setting of the OVP po ten ti om e ter.

When the power sup ply is used on a fixed out put voltage it is
highly rec ommended to set the Over Volt age Pro tector. As set
out in the following ta ble:

SM15-200D SM30-100D

SM45-70D

SM70-45D

SM120-25D SM300-10D

Vout + 2 V

Vout + 3 V

Vout + 5 V

Vout + 5 V

Vout + 10 V Vout + 25 V

Ex am ple: For a SM30-100D set at 24 V out put voltage it is recom-
mended to set the OVP on 24 + 3 = 27 V.

Check that the cool ing of the unit is not ob structed.

2)

AN A LOG PRO 

GRAMMING

Put the ap propriate switch(es) in the po sition PROGRAM.

Connect the pro gramming voltage source(s) (0 - 5 V) to the AN A-
LOG PROG. CON NECTOR on the rear panel (see fig. 4 - 2 and
fig. 4 - 3). Al ways use a

shielded ca ble

 for pro gramming.

If only the voltage is pro grammed, the max imum current can still
be set with the CC po tentiometer and vice versa. If this is not de -
sirable the CC or CV can be set with an ex ternal po tentiometer, in 
order to have a fixed set ting.

CAU TION

: The an alog in puts are not iso lated from the output.

The Ø of the prog. in put (pin 1) is in ternally con nected to the S–,
the S– is connected to the neg ative output. To pro tect the in ternal
wiring a 650 mA self-resetting fuse is con nected in se ries (F600
on P432) (see fig. 3 - 10).

For iso lated an a log pro gram ming the

ISO AMP CARD

(

δ

-prod-

uct)

 is rec ommended to avoid earth loops.

To avoid hum or noise, the pro gramming ca ble may have to be 
twisted in some cases.

To pro gram the unit by current in stead of volt age, sim ply use a
parallel re sistor as a current to volt age con verter.

3)

IEEE488 / RS232  PRO GRAMMING

Set both prog. switches to the po sition pro gram.

Both CV and CC can be pro grammed and read back. The CC and 
OVP sta tus can also be read by the computer.

4)

MON I TORING OUT PUTS

The 5 V level is com patible with most in terfaces.

The mon itoring out puts can drive a me ter di rectly (see fig. 4 - 4).

fig. 4 - 1

Low re sis tive ca ble con nec tion by mount ing the

cables di rectly on the tinned out put strips

fig. 4 - 2

Pro gram ming by volt age:

left voltage -, right current pro gramming

fig. 4 - 3

Pro gram ming by cur rent

left voltage -, right current pro gramming

fig. 4 - 4

Re mote con trol

Summary of Contents for SM 120-25 D

Page 1: ...5 200D SM 30 100D SM 45 70D SM 70 45D SM 120 25D SM 300 10D SM 3000 series Elso Philips Service Jilemnick ho 2 911 01 Tren n tel 421 32 6582410 7431690 fax 421 32 6582592 email elso elso sk web www el...

Page 2: ...he protective earth terminal must be connected to the safety electrical ground before another connection is made Any interruption of the protective ground conductor or disconnection of the protective...

Page 3: ...l Shock Instruction manual symbol The instrument will be marked with this symbol when it is necessary for the user to refer to the instruction manual Protective ground conductor terminal o Off supply...

Page 4: ...r cuit 2 INPUT VOLTAGE The power supplies have a wide input volt age range The units need a 3 phase input voltage but no neutral connection is required The units can also operate on one phase but at 9...

Page 5: ...lways use a shielded ca ble for programming The inputs have a protection circuit formed by a series resistor and a parallel zener see fig 3 7 The capacitor limits the speed to a safe value Note that t...

Page 6: ...h 13 PROGRAMMING SPEED The response time is measured with a step waveform at the CV prog input Programming from a low to a high output voltage is nearly load independent but programming down to a low...

Page 7: ...gh energy pulse of about 300 V If there is an electrical connection between the output and the input through the oscilloscope you will get a false reading The suppression for the SM120 25D is lower bu...

Page 8: ...tch shuts down the output in case of insufficient cooling After cooling down the unit will start working again The thermal protection circuit protects 2 parts separately in the unit the switching tran...

Page 9: ...ecommended for more than 3 units or in combination with Fast Programming option Consult factory for a solution 29 REMOTE SENSING The voltage at the load can be kept constant by remote sensing This fea...

Page 10: ...re and full load the fan will run at a very low speed The fan does not operate on no load Normally at 50 C ambient and full load the fan will not work at full speed Since the fan is over rated it will...

Page 11: ...TER circuit so no large inrush cur rent will flow As soon as the voltage is sufficiently high the power supply starts working and the series resistor is bypassed by a relay contact The operating switc...

Page 12: ...recom mended to set the OVP on 24 3 27 V Check that the cooling of the unit is not obstructed 2 ANALOG PROGRAMMING Put the appropriate switch es in the position PROGRAM Connect the programming voltage...

Page 13: ...put terminals so the OVP setting should be increased by the total voltage drop in the load leads 7 BATTERY CHARGER The CV CC regulated power supplies are ideal battery charg ers Once the output is set...

Page 14: ...ecommended for more than 4 units consult factory for using more than 4 power supplies in parallel First connect output terminals and test system in normal paral lel operation Ensure that all power con...

Page 15: ...PERATION For complex combinations as mixed series parallel always use the MASTER SLAVE SERIES ADAPTER product See fig 4 14 for an example of how to connect 2 units in se ries in parallel with 2 units...

Page 16: ...supply to dry before switching it on again 3 GALVANIC INDUSTRY For using the power supplies in the galvanic industry it is strongly recommended to take precautions against an aggressive environ ment...

Page 17: ...current is flowing through pin 1 of the prog connector Please check why current is flowing through pin 1 see also next paragraph 4 and fig 4 17 4 PROGRAMMING OFFSETS Unwanted offsets in the programmi...

Page 18: ...not try to re pair P430 except for D400 D401 F400 and F401 but send P430 for repair or ask for replacement 10 CHECK POINTS IN CASE OF A SERIOUS FAILURE Check output diodes Defective diodes give a sho...

Page 19: ...put with exactly 5 00 V Set output voltage to a low value en suring the power supply is in CC mode Measure the output current with an ac curate shunt Calibrate the current with R686 exactly on the rat...

Page 20: ...l Journal of the European Communities EN 61204 3 EMC low voltage power supplies EN 61000 6 3 Generic Emissions residential light industrial EN 55022 Radiated and conducted Class B EN 61000 3 3 Voltage...

Reviews: