background image

 

 

 

 Please read this instruction sheet carefully before use and follow the sheet to operate TAP-CP01 in order to prevent 

damages on the device or injuries to staff.

 

 

Switch off the power before wiring.

 

 

This instruction sheet only provides introductory information on electrical specifications, functions, wiring, 
trouble-shooting and peripherals for TAP-CP01.

 

 

TAP-CP01 is an OPEN-TYPE device and therefore should be installed in an enclosure free of airborne dust, humidity, 
electric shock and vibration. The enclosure should prevent non-maintenance staff from operating the device (e.g. key 
or specific tools are required to open the enclosure) in case danger and damage on the device may occur. DO NOT 
touch any terminal when the power is switched on.

 

 

In order not to damage it, only qualified professional staff familiar with the structure and operation of TAP-CP01 
can stall, operate, wire and repair it.

 

 

DO NOT connect input AC power supply to any of the I/O terminals; otherwise serious damage may occur. Check all 
the wiring again before switching on the power and DO NOT touch any terminal when the power is switched on. 
Make sure the ground terminal 

 

is correctly grounded in order to prevent electromagnetic interference.

 

Thank you very much for choosing Delta TAP-CP01 Power Supply Distribution Box. TAP-CP01 supplies power 

to DeviceNet. TB1 and TB2 connect to DeviceNet cable. J1 connects to the power supply. EF1 and EF2 

connect to two 7.5A fuses. TAP-CP01 formulates a 121

 termination resistance, which is switched by a setup 

switch. 

 Product Profile & Outline

 

1

 

DeviceNet cable connector 

2

 

DeviceNet cable connector 

3

 

7.5A fuse 

4

 

7.5A fuse 

5

 

121

 termination resistance 

6

 

Termination resistance setup switch 

7

 

Network power supply connector 

53.9 
[2.12]

8

6

.8

 

[3

.4

2

]

71.2 
[2.80]

 

Unit: mm [inch]

 

8

 

DIN rail 

 

 

 Electrical Specifications

 

Power Input 

Voltage: 11 ~ 25V DC 
Current: 7.5A    max 

 Environment

 

Operation: 0

o

C ~ 55

o

C (temperature), 50 ~ 95% (humidity), pollution degree 2 

Operation/storage 

Storage: -25

o

C ~ 70

o

C (temperature), 5 ~ 95% (humidity) 

ENGLISH 

 

 

 

Use efficient tool to peel the communication cable for 

approx. 30mm. DO NOT damage the shielded cable 

while peeling.

 

Approx. 30mm

 

 

Peel off the metallic shielded net and foil, and you will 

find 2 power cables (in red and black), 2 signal cables 

(in blue and white) and 1 shielded cable.

 

Shielded cable

 

 

Peel off the exterior metallic shielded net, foil and the 

plastic cover of the power cable and signal cable in 

proper length.

 

 

 

Insert the peeled communication cables into the holes in 

the connector in correct order.

 

Black (V-)

Blue (CAN_L)

Shielded cable (CAN_SHLD)

Red (V+)

White (CAN_H)

 

 

Tighten the screws on the connector by a slotted 

screwdriver and fix the communication cables in the 

holes in the connector.

 

Screw by a slotted screwdriver.

 

 

Use standard 35mm DIN rail.

 

 

Install TAP-CP01 onto the DIN rail.

 

 

 

 

 

 

 

Insert the connector into TAP-CP01.

 

Insert the communication connector into
TAP-CP01 communication terminal.

Connect 24VDC power supply to 
TAP-CP01 network power supply
connector.

 

Notes:

 

1.

 

Use only wires specifically designed for DeviceNet wiring. 

2.

 

DO NOT place the signal cable and power cable in the same wiring circuit. 

 

 

T

B

2

T

B

1

T

h

ic

k

/T

ti

n

 C

a

b

le

T

h

ic

k

/T

h

in

 C

a

b

le

V +

H

S

L

V-

V +

S

V-

1

2

1

J1

V +

H

S

L

V-

E F2

E F1

 

 

 

 DeviceNet Connector 

To connect to the DeviceNet network, use the connector enclosed with TAP-CP01 or any connectors you can 

buy in the store for wiring. 

PIN 

Signal 

Description 

V- 

V- 

0V DC 

CAN_L 

Signal- 

SHIELD 

Shielded cable 

CAN_H 

 

V+ 

V+ 

24V DC 

 

V-

L

S

H

V+

 

 

PIN 

Signal 

Description 

V+ 

V+ 

24V DC 

V- 

V- 

0V DC 

SHIELD 

Shielded cable 

V-

S

V+

 

 Termination Resistance Setup Switch 

ON
OFF

 

The termination resistance switch is used for determining whether the resistance is valid. 

ON = Valid; OFF = Invalid

 

 Termination Resistance

 

 

TAP-CP01 formulates a 121

 termination resistance. 

 Fuse

 

 

TAP-CP01 formulates two 7.5A fuses, EF1 and EF2. 

Notes: 

When you are using the fuse and remove the fuse from the slot, the network power supply for the corresponding branch 
will be cut off. For example, once EF1 is removed, the network power supply for the bus connected at TB1 will be cut off. 

 

The entire network can contain only one earth point to avoid circulating current. 

 Single Power Supply

 

Connect V- and the shielded cable to the earth using 25mm copper net or 8AWG copper cable of length shorter 

than 3m. 

T

B

2

T

B

1

V+

H

S

L

V-

V+

S

V-

J1

V+

H

S

L

V-

V+
V-

Power Supply

V+
V-

Power Supply

EF2

EF1

 

 Multi Power Supply

 

When many power supplies are connected in a network, connect V- to V- and disconnect V+ to V+. Only one 

earth point is allowed in the network.

 

T

B

2

T

B

1

V+

H

S

L

V-

V+

S

V-

J1

V+

H

S

L

V-

V+
V-

Power Supply

EF2

EF1

V+
V-

Power Supply

V+
V-

Power Supply

T

B

1

V+

H

S

L

V-

V+

S

V-

J1

V+

H

S

L

V-

V+
V-

Power Supply

EF2

EF1

One earth
point only.

Disconnect V+

 

Establishing a network through TAP-CP01: 

 

 

To install TAP-CP01 at the starting point or end point of the network, you have to switch ON the termination 

resistance. To install TAP-CP01 in the middle of the network, you have to switch OFF the termination 

resistance.

 

  When using TAP-CP01 to establish a DeviceNet network, the thin cable cannot be longer than 6m.

 

 

注意事項 

 

請在使用前,務必仔細閱讀本使用手冊,並按照本手冊指示進行操作,以免造成產品受損,或導致人員受傷。

 

 

實施配線,務必關閉電源。

 

 

本使用說明書僅提供電氣規格、功能規格、安裝配線及周邊裝置部分說明。

 

 

本機為開放型

  (OPEN TYPE)

 

機殼,因此使用者使用本機時,必須安裝於具防塵、防潮及免於電擊∕衝擊意

外的外殼配線箱內。另必須具備保護措施(如:特殊的工具或鑰匙才可打開),防止非維護人員操作或意外
衝擊本體,造成危險及損壞。請勿在上電時觸摸任何端子。

 

 

為避免損壞本產品,只有合格且熟悉本產品結構及操作的專業人員才可進行本產品的安裝、操作、配線及維

護。

 

 

交流輸入電源不可連接於輸入∕輸出訊號端,否則可能造成嚴重損壞。請在上電前再次確認電源配線,且請

勿在上電時觸摸任何端子。本體上的接地端子

 

 

務必正確的接地,以提高產品抗雜訊能力。

 

產品簡介

謝謝您使用台達

TAP-CP01

電源分接盒。

TAP-CP01

定義為

DeviceNet

電源分接盒,為

DeviceNet

提供網路電源。

TB1

TB2

用於連接

DeviceNet

匯流排,

J1

用於連接電源,

EF1

EF2

用於連接兩個

7.5A

的熔斷器。

TAP-CP01

集成一個

121

Ω的終端電阻,並通過開關來切換是否有效。

 

 

產品外觀及各部介紹

 

1

  DeviceNet

匯流排通訊連接器

 

2

  DeviceNet

匯流排通訊連接器

 

3

  7.5A

熔斷器

 

4

  7.5A

熔斷器

 

5

  121

Ω終端電阻

 

6

 

終端電阻設置開關

 

7

 

網路電源連接器

 

53.9 
[2.12]

8

6

.8

 

[3

.4

2

]

71.2 
[2.80]

 

尺寸單位:

mm [inch] 

8

  DIN

軌槽

 

 

功能規格

 

 

電氣規格

 

電源輸入

 

電壓規格:

11 ~ 25V DC 

電流規格

最大

7.5A 

 

環境規格

 

操作:

0ºC ~ 55ºC

(溫度)

50 ~ 95%

(濕度)

、污染等級

  2 

操作∕儲存環境

 

儲存:

-25ºC ~ 70ºC

(溫度)

5 ~ 95%

(濕度)

 

繁體中文 

 

安裝說明

 

 

請使用專業工具將通訊電纜剝開大約

30mm

,在剝線過程

中注意不要損壞遮罩線。

 

大約 30mm

 

 

剝開外層的金屬遮罩網和鋁箔,你會看到

2

根電源線(紅

色和黑色)

2

根訊號線(藍色和白色)

1

根遮罩線。

 

遮蔽線

 

 

去除外層的金屬遮罩網和鋁箔,然後剝去電源線以及訊號

線的塑膠表皮,剝開的長度要適當。

 

 

 

將剝開的通訊電纜按照正確的順序嵌入通訊連接器的線

孔內,如右圖所示。

 

藍色(CAN_L)

遮蔽線(CAN_SHLD)

黑色(V-)

紅色(V+)

白色(CAN_H)

 

 

使用標準的一字起子旋緊通訊連接器的螺絲,將通訊電纜

固定於通訊連接器的線孔內。

 

使用標準的一字起子旋緊

 

 

請使用

35mm

的標準

DIN

軌。

 

 

TAP-CP01

固定在

  DIN 

軌上,如下圖所示:

 

 

 

 

 

 

Reviews: