12
From Section 1
Step 4
BB. M6 x 40 mm Bolt x 2
M4 Allen Wrench
Supplied
P. Stabilizer Bar x 1
M. Crib End x 1
EE. M4 x 30 mm Metal Pin x 2
M
P
BB
BB
EE
EE
Step 1
Section 2: Crib Assembly
Parts and tools required to complete step.
1. Insert (1) M4x30mm Metal Pin (Part EE) into the hole in each of the Stabilizer Bar (Part P).
2. Insert the Metal Pin into the hole in the Front Post of the Finished Changing Table. Attach with (1)
M6x40mm Bolts (Part BB). Repeat above with the Crib End (Part M). Do Not tighten bolts completely.
They will be tightened in Section 2 Step 4.