16
Step 1
Étape 1
Paso 1
ASSEMBLY INSTRUCTIONS •
INSTRUCTIONS DE MONTAGE • INSTRUCCIONES DE MONTAJE
ASSEMBLY INSTRUCTIONS •
INSTRUCTIONS DE MONTAGE • INSTRUCCIONES DE MONTAJE
M4 Ballend Screwdriver
tournevis M4 à tête sphérique
destornillador M4 con cabeza de bola
M4 Allen Wrench (included)
Clé Allen M4 (inclus)
Llave Allen M4 (incluido)
CC.50mm Bolt x5
Boulon 50mm
Perno 50mm
BB. Crescent Washer x5
Rondelle en croissant
Arandela de media luna
FF. M6x30mm Wood Dowel x8
Cheville en Bois M6x30mm
Pasador de Madera M6x30mm
Attach Bottom Front Rail (Part T), Bottom Back Rail (Part D), Top Front Rail (Part E) and Top
Back Rail (Part F) to
Left Side
(Part B) using (5) 50mm bolts (Part CC), (5)
Crescent Washer
(Part BB) and (8) 30mm
Dowels (Part FF)
.
Tighten the Bolts with the M4 Ballend Screwdriver
and M4 Allen wrench, following the instructions on pages 14 and 15.
Fije la
Barra frontal inferior
(Pieza T),
Barra trasero inferior
(Pieza D), Barra Frontal Superior
(Pieza E) y Barra Posterior Superior (Pieza F) al
Lado izquierdo
(Pieza B) utilizando (5)
Pernos 50mm (Pieza CC), (5)
Arandela de media luna
(Pieza BB) y (8)
Pasadors
30mm
(Pieza FF)
utilizando el destornillador M4 con cabeza de bola y la llave Allen M4
siguiendo las instrucciones de laspáginas 14 y 15.
Fixer le
Barre avant inférieur
(Pièce T),
Barre arrière inférieur
(Pièce D), Barre Supérieur
avant (Pièce E) et Barre Supérieur Arrière (Pièce F) au
Côté gauche
(Pièce B) à l’aide de
(5) boulons de 50mm (Pièce CC), (5)
Rondelle en croissant
(Pièce BB) et (8)
Chevilles
30mm (Pièce FF)
à l’aide de dutournevis M4 à tête sphériqueet la clé Allen M4 ensuivant
les instructions pages 14 et 15.