background image

Shenzhen Delong Energy Technology Co.,Ltd

深圳德隆能源有限公司

Address: 9098,DongBian Business Building, MinZhi Road 369, MinZhi Street,Longhua New District, Shenzhen city, Guangdong Province,China

TEL: +86 755 21012989

FAX: +86 755 33815254

9

4.1 Precautions before installation

1) After unpacking, please check product working or not
2) Before installation, be sure to cut off the grid power and make sure the battery is in the
turned-off mode;
3) Wiring must be correct, do not mistake the positive and negative cables, and
ensure no short circuit with the external device;
4) It is prohibited to connect the battery and AC power directly;
5) The embedded BMS in the battery is designed for 48VDC, please DO NOT connect battery in
series before confirm with the supplier
6) Battery system must be well grounded and the resistance must be less than 1

Ω

;

7) Please ensured the electrical parameters of battery system are compatible to
related equipment;
8) Keep the battery away from water and fire.
4.2 Notes in the process of use
1) If the battery system needs to be moved or repaired, the power must be cut off and the
battery is completely shut down;
2) It is prohibited to connect the battery with different type of battery.
3) It is prohibited to put the batteries working with faulty or incompatible inverter;
4) It is prohibited to disassemble the battery (QC tab removed or damaged);
5) In case of fire, only dry powder fire extinguisher can be used, liquid fire extinguishers are
prohibited;
6) Please do not open, repair or disassemble the battery except staffs from Manufacture or
authorized by dealer. We do not undertake any consequences or
related responsibility which because of violation of safety operation or violating of design,
production and equipment safety standards.

Reminded

1) Please read the user manual carefully (in the accessories);
2) If the battery is stored for long time , it is required to charge them every six months,
and the SOC should be no less than 80%;
3) Battery needs to be recharged within12 hours, after fully discharged;
4) All the battery terminals must be disconnected for maintenance;
5) Please contact the supplier within 24 hours if there is something abnormal.

Summary of Contents for LFP-51200-10

Page 1: ...ian Business Building MinZhi Road 369 MinZhi Street Longhua New District Shenzhen city Guangdong Province China TEL 86 755 21012989 FAX 86 755 33815254 1 Lithium Iron Phosphate Battery User Operation Manual Product Name Lifepo4 Battery Pack Model LFP 51200 10 20 30 40 50 ...

Page 2: ...is within range of your voice or close enough to come to your aid when you are working near a battery Wear complete eye face protection and gloves Avoid touching your eyes while working near batteries If you need to disconnect the battery always remove the negative terminal from the battery first Make sure all accessories are turned off so you don t cause a spark Never use or combine this battery ...

Page 3: ...and temperature What s more BMS can balance cells charging and discharging to extend cycle life Multiple batteries can connected in parallel to expand capacity and power in parallel for larger capacity and longer power supporting duration requirements 1 1 Features The whole module is non toxic non polluting and environmentally friendly Cathode material is made from LiFePO4 with safety performance ...

Page 4: ...DongBian Business Building MinZhi Road 369 MinZhi Street Longhua New District Shenzhen city Guangdong Province China TEL 86 755 21012989 FAX 86 755 33815254 4 1 2 Specifications 1 3 Interfacing This section details the front and back panel of the interface functions ...

Page 5: ...ty No power ALARM Alarm light Battery failure status indicator light red for failure green for normal Battery indicator Battery Capacity Power display six indicator lights show the current power CAN CAN Communication Terminal RJ45 port follow CAN protocol for output batteries information RS232 R232 Communication Terminal RJ11 port follow RS232 protocol for output batteries information RS485 R485 c...

Page 6: ... 3 6s and release it the protection board will sleep and the LED indicator will light up for 0 5 seconds from the lowest battery level light When BMS is in the active state press the button 6 10s and release it the protection plate is reset and all LED lights are on for 1 5 seconds at the same time DIP ADD DIP ADD Switch 4 ADD switches to definite different address code for each battery module whe...

Page 7: ...lable cover the entire exposed metal surfaces of the available tools except their tips with electrical tape 2 2 Safety protection It is recommended to wear the following safety gear when dealing with the battery pack 3 Installation 3 1 Package Items No Item picture Qauntity Specification 1 Battery pack 1pc Wall mounted 48V 200Ah 10kwh 2 base 1 pc 3 Communication Cable 1 pc 4 Parallel Cable 1set 3 ...

Page 8: ... is within the range from 0 C to 50 C The temperature and humidity is maintained at a constant level There is minimal dust and dirt in the area Installation Procedure 1 Put the batteries on the base 2 Connect the cables between battery modules 3 Connect the Communication cable between battery modules 4 Connect the cables to inverter A Power On Double check all the power cable and communication cab...

Page 9: ...es in the process of use 1 If the battery system needs to be moved or repaired the power must be cut off and the battery is completely shut down 2 It is prohibited to connect the battery with different type of battery 3 It is prohibited to put the batteries working with faulty or incompatible inverter 4 It is prohibited to disassemble the battery QC tab removed or damaged 5 In case of fire only dr...

Page 10: ...ddress 9098 DongBian Business Building MinZhi Road 369 MinZhi Street Longhua New District Shenzhen city Guangdong Province China TEL 86 755 21012989 FAX 86 755 33815254 10 6 The warranty claims are excluded for direct or indirect damage due to items above ...

Reviews: