background image

3.  SPECIFICATION

Model no’s

..........................................................DG96, DG97

F

uel consumption

 .......................................................945g/hr

F

uel

 ...........................................................................

Propane

Heated area

 ...................................................................10m²

Output

 ...........................................................................13kW

D

imensions (W x H) ........................................850 x 2190mm

M

ax. gas bottle size (W x H) ..........................Ø325 x 700mm

4.  CONTENTS

5.  ASSEMBLY

5.1.    

STEP  1

5.1.1.   

Fix wheel bracket to base.

5.2.    

STEP  2

5.2.1.   

Fix the 3 post brackets as shown. Use bolt BB to join post brackets to the stand.

5.3.    

STEP  3

5.3.1.   

Fix the post to the 3 post brackets. Use bolts EE and nuts CC. Tighten nuts and bolts.

Original Language Version

PART

DESCRIPTION

QTY.

A

R

eflector outer

3

B

R

eflector inner

1

C

B

urner head assembly

1

D

Cylinder housing

1

E

Main pole

1

F

Gas hose

1

FF

R

eflector spacer

3

G

S

upport leg

3

H

B

ase

1

I

W

heel kit

1

Step 1

Step 2

Step 3

D

G96, DG97  Issue:1   24/12/20

Reviews: