- 13 -
4.2 Assembly SOP
Preparation before assemble
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipment, material as bellow:
1) Working table
2) Philips-head screwdriver
3) Glove
4) Cleaning cloth
5) ESD protection
Item
Picture
Operation
Tools
Notes
1
1. Place Main SHD on the
worktable.
2. Assemble SPS BD into Main
SHD
3. Insert FFC LVDS into I/F BD
4. Insert SPS BD to I/F BD wire
into I/F BD.
5. Assemble I/F BD into Main
SHD
6. Lock 8 PCBA screws
7. Assemble Safety Mylar on SPS
BD
Philips-head
screwdriver
Torsion of
PCB screw:
6~7kgf
Summary of Contents for S2721DB
Page 1: ...Simplified Service Manual S2721DB S2721DSB Version 01 Date 2021 03 08 ...
Page 8: ... 8 3 Wiring connectivity diagram FFC 2 FFC 3 FFC 1 Wire 1 ...
Page 17: ... 17 5 Trouble shooting instructions ...
Page 18: ... 18 ...
Page 19: ... 19 ...
Page 20: ... 20 ...
Page 21: ... 21 ...
Page 22: ... 22 ...
Page 23: ... 23 ...