- 11 -
4.2 Assembly SOP
Preparation before assemble
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipment, material as bellow:
1) Working table
2) Philips-head screwdriver
3) Hex-head screwdriver
4) Glove
5) Cleaning cloth
6) ESD protection
Item
Picture
Operation
Tools
Notes
1
1. Place Main SHD on the
worktable.
2. Assemble SPS BD into Main
SHD
3. Insert FFC LVDS into I/F BD
4. Insert SPS BD to I/F BD wire into
I/F BD.
5. Assemble I/F BD into Main SHD
6. Lock 6 PCBA screws
7. Lock 4 hexagonal screws.
1. Philips-
head
screwdri
ver
Torsion of
PCB screw:
6.5±1.0Kg
2. Hex-
head
screwdri
ver
Torsion of
hex screw:
5.0±0.6Kg
Summary of Contents for P2421B
Page 1: ... 1 Simplified Service Manual P2421B Version 01 Date 2021 03 04 ...
Page 7: ... 7 3 Wiring connectivity diagram Wire 1 FFC 1 FFC 2 ...
Page 14: ... 14 5 Trouble shooting instructions ...
Page 15: ... 15 ...
Page 16: ... 16 ...
Page 17: ... 17 ...
Page 18: ... 18 ...
Page 19: ... 19 ...
Page 20: ... 20 ...
Page 21: ... 21 ...
Page 22: ... 22 ...