-
14
-
5.2 Assembly SOP
(P2222Hb)
Preparation before assembly
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipment, materials as bellow
:
1) Working table
2) Philips-head screwdriver
3) Hex-head screwdriver
4) Gloves
5) Cleaning cloth
6) ESD protection
Item
Picture
Operation
Tools
Notes
1
1. Assemble SPS BD in Main
SHD
2. Insert the LVDS cable into I/F
BD
3. Insert SPS BD cable into I/F BD
and then assemble I/F BD into
Main SHD
4. Lock 5 PCB screws and 2 hex
screws
1. Philips-
head
screwdriver
Torsion of
PCB screw:
8.5±1kgf
2. Hex-head
screwdriver
Torsion of
hex screw:
5±0.6Kgf
2
1. Assemble Mylar
(
Paste Mylar
on Main SHD like the picture
showed
)
Summary of Contents for P2222HB
Page 1: ... 1 Service Manual P2222Hb P2222Ht Version 01 Date 2022 03 11 ...
Page 9: ... 9 4 Wiring connectivity diagram P2222Hb Wire1 FFC 1 FFC 2 ...
Page 17: ... 17 6 Exploded view diagram with list of items P2222Ht ...
Page 18: ... 18 7 Wiring connectivity diagram P2222Ht ...
Page 19: ... 19 8 Disassembly and Assembly Procedures P2222Ht 8 1 Disassembly Procedures P2222Ht ...
Page 20: ... 20 ...
Page 21: ... 21 ...
Page 22: ... 22 8 2 Assembly Procedures P2222Ht ...
Page 23: ... 23 ...
Page 24: ... 24 ...
Page 25: ... 25 ...
Page 28: ... 28 10 Trouble shooting instructions ...
Page 29: ... 29 ...
Page 30: ... 30 ...
Page 31: ... 31 ...
Page 32: ... 32 ...
Page 33: ... 33 ...
Page 34: ... 34 ...
Page 35: ... 35 ...
Page 36: ... 36 ...