Installation and Service Guide
3.1.
General Recommendations
Important
The Data Processing Site manager must allocate enough
personnel to ensure safe handling.
Cabinets may be delivered either equipped with servers and devices or empty,
according to the model chosen.
Site preparation must be completed by the pre-arranged delivery date.
Any delay due to non-completion of the site by the pre-arranged date will be
considered as the Customer's responsibility.
Note
R@ck'n Roll Cabinet 1200 unpacking and depalletizing instructions are
clearly set out on a label attached to the front door of the cabinet.
D008
DANGER
D008:
The loaded cabinet is extremely heavy and will require the use of an
elevator.
It is mandatory for the loaded cabinet to be transported vertically, as
indicated on the packing.
Important
The Data Processing Site manager must set aside the
required working area for unpacking.
See
2.1. Service Clearance, on page 2-1 for more information.
Summary of Contents for M3S2G8
Page 4: ......
Page 20: ......
Page 80: ...5 4 Installation and Service Guide 5 Proceed in the same way from the rear of the cabinet ...
Page 84: ...5 8 Installation and Service Guide 5 Proceed in the same way from the rear of the cabinet ...
Page 96: ......
Page 100: ......
Page 106: ......