7
Installation and Startup
|
3
Attach the rails to the rack:
Engage the back end of the rail until it fully seats on the vertical rack flange and the hook latch
locks in place.
Pull the rail toward the front.
Push the front end of the rail until it fully seats on the vertical rack flange and the hook latch locks
in place.
Installing the Cabinet
NOTE:
Install the EBM directly below the UPS.
4
Slide the cabinet into the rack.
Summary of Contents for H952N
Page 2: ......
Page 12: ...10 Installation and Startup ...
Page 22: ...20 Installation et démarrage ...
Page 32: ...30 Installation und Inbetriebnahme ...
Page 42: ...40 Установка и запуск ...
Page 52: ...50 Instalación y arranque ...
Page 60: ...58 安装和启动 固定机箱 5 用固定架上的翼形螺钉将机箱前端固定到机架上 用手拧紧 不要使用电动工具 安装 EBM 前盖 6 安装 EBM 前盖 ...
Page 62: ...60 安装和启动 ...
Page 70: ...68 固定機箱 5 用固定架上的翼形螺釘將機箱前端固定到機架上 用手擰緊 不要使用電動工具 安裝 EBM 前蓋 6 安裝 EBM 前蓋 ...
Page 72: ...70 ...
Page 82: ...80 설치 및 시동 ...
Page 92: ...90 インストールおよび起動 ...
Page 93: ......
Page 94: ... 1642018161 164201816 1 ...