16
Site Preparation
Tools Required
S-Series switches are shipped fully assembled, encased in foam. A utility knife is useful for cutting the
packing tape, and a Philips #2 screwdriver is required for attaching rack screws, and is also used for making
some attachments, including DC cables and rear cover plates.
Warning:
Electrostatic discharge (ESD) damage can occur when components are mishandled. Always
wear an ESD-preventive wrist or heel ground strap when handling the S25P and its accessories. After you
remove the original packaging, place the S25P and its components on an antistatic surface.
Summary of Contents for Force10 S25-01-GE-24P
Page 1: ...Installing the S25P System December 15 2008 100 00058 02 ...
Page 44: ...44 ...