Figure 6. Platform rail attachment
3. Repeat on the other side of the platform.
4. Attach the platform rails to the four-post rack rails using two user-supplied screws on each side.
Figure 7. Platform four-post front installed
5. Slide the rear platform rail from the back to the front bracket. Secure with two user-supplied screws on each side.
Figure 8. Platform four-post rear installed
About three inches before you fully insert your platform, the rail locking feature engages to keep the platform from inadvertently sliding
out and falling.
To remove the platform, unscrew the rack-mounting screws and slide the platform forward.
Optics installation
WARNING:
When working with optical fibers, follow all warning labels and always wear eye protection. Never look
directly into the end of a terminated or unterminated fiber or connector as it may cause eye damage.
1. Position the optic so it is in the correct position.
The optic has a key that prevents it from being inserted incorrectly.
2. Insert the optic into the port until it gently snaps into place.
NOTE:
When you cable the ports, be sure not to interfere with the airflow from the small vent holes above and below
the ports.
VEP4600 installation
11