Page 1: ...Disk Library for mainframe Version 5 1 Physical Planning Guide for DLm8500 302 005 777 Rev 01 July 2019 ...

Page 2: ...ECIFICALLY DISCLAIMS IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE USE COPYING AND DISTRIBUTION OF ANY DELL SOFTWARE DESCRIBED IN THIS PUBLICATION REQUIRES AN APPLICABLE SOFTWARE LICENSE Dell Technologies Dell EMC Dell EMC and other trademarks are trademarks of Dell Inc or its subsidiaries Other trademarks may be the property of their respective owners Published in the ...

Page 3: ...D Physical Planning Overview 20 DLm8500 Single Rack Solution for Data Domain configuration 20 DLm8500 with DD Multiple Rack Solution configuration 24 DAE 27 Installing the DLm VTEC hardware into a third party rack in the field 27 DLm8500 DD Configuration and Host Connectivity 29 Network software ports needed to support DLm replication operations 29 Network software ports needed to support DLm debu...

Page 4: ...ouch current compliance 44 Choosing a UPS 44 DLm8500 System Service Area and Removal 47 Dimensions and service area 48 Shipping dimensions and clearance requirements 48 System placement 50 DLm8500 configuration floor cutouts 50 Anti tip and anti move brackets 51 Package Removal 52 Inspect the system shipment 52 Unpacking procedure 53 Chapter 5 Appendix A Contents 4 Disk Library for mainframe Physi...

Page 5: ...ata Domain and ECS 25 Fully loaded DLm8500 Multiple Rack Solution with PowerMax and ECS 26 Power distribution cabling DLm8500 32 Power distribution cabling DLm8500 39 DLm8500 cabinet dimensions and access area 48 Shipping dimensions 49 Unloading the pallet 50 DLm8500 configuration floor cutout 51 Rack measurements for anti tip brackets 51 Rack measurements for anti move brackets 52 Cutting the tap...

Page 6: ...Figures 6 Disk Library for mainframe Physical Planning Guide for DLm8500 ...

Page 7: ...umption and heat dissipation 32 DLm8500 Single Rack HA Solution VTEC equipment power consumption and heat dissipation 32 DLm8500 customer network cable requirements 33 DLm8500 replication cable requirements 33 Physical specification of the VTEC cabinet 37 DLm8500 external network requirements 37 North American single phase electrical specifications 38 DLm8500 Multiple Rack Solution for PowerMax po...

Page 8: ...Tables 8 Disk Library for mainframe Physical Planning Guide for DLm8500 ...

Page 9: ...an overview of the planning requirements for Dell EMC Disk Library for mainframe DLm installation l Planning overview 10 l DLm system presite considerations 11 l Pre installation considerations 12 Disk Library for mainframe Physical Planning Guide for DLm8500 9 ...

Page 10: ...ly equipped computer room with controlled temperature and humidity proper airflow and ventilation proper power and grounding system cable routing facilities fire equipment and so on A raised floor is recommended although it is not required One or more planning sessions with your Systems Engineer and Customer Support Representative must close all the details that are related to installation The fol...

Page 11: ...DA Standards for Accessible Design 28 CFR Part 36 l Weight capacities of the loading dock l Weight capacities of the tailgate Other requirements are l Appropriate floor covering for protection l Hardware power requirements l Power requirements for the DLm cabinets Transportation and delivery guidelines This section describes about transportation and delivery guidelines Mode of transport guidelines...

Page 12: ...ific DLm model CAUTION When moving the DLm cabinets down an incline the rear of the cabinet must go first and when moving up an incline the rear of the cabinet must go last Remote support This section describes about the remote support service Remote support is an important and part of the Dell EMC customer service and support strategy Communication between the Dell EMC Customer Support Center and...

Page 13: ...alled or when new storage systems or VTEs are added to the DLm Planning for upgrades When planning for upgrades consider space power and environmental concerns Physical Planning Overview Disk Library for mainframe Physical Planning Guide for DLm8500 13 ...

Page 14: ...Physical Planning Overview 14 Disk Library for mainframe Physical Planning Guide for DLm8500 ...

Page 15: ...d host connectivity requirements common to all DLm modules l Network software ports needed to support DLm operations 16 l Network software ports needed to support DLm Disaster Recovery Testing 17 l Installation information 17 Disk Library for mainframe Physical Planning Guide for DLm8500 15 ...

Page 16: ...and protocols along with indications as to what services use them Table 2 Required Network Ports for DLm Operations Port Number Port Type Protocol s Traffic User Direction of Traffic Notes 20 TCP FTP Data Outbound To From SRS 21 TCP FTP Command Control Inbound Outbound To From SRS 22 TCP SSH SCP Secure Shell Secure Copy Inbound Outbound To From SRS 25 TCP SMTP E mail Outbound Data Domain and Conne...

Page 17: ... back end storage system type The following table lists the special port for Disaster Recovery testing for the various DLm models Table 3 Required Network Port for Disaster Recovery Testing DLm Model Port Number Port Type Traffic User Direction of Traffic Notes DLm8500 with PowerMax 9050 TCP DLMDRD D Lm disaster recovery Outbound DR to maintain DLm8500 with Data Domain 9060 TCP DLMAUT Inbound Outb...

Page 18: ...ame logical device name for VTE display l Tape volume prefix Tape management system information l Tape management system l Version l Scratch reports used Tape volume information l Volume serial number range for VTE tapesa l Quantity of tape volumes Purpose of DLm l Number of physical drives that virtual tapes replace l Mainframe applications that access the virtual tapes l Backup software that is ...

Page 19: ...h Data Domain DD system at the customer site l DLm8500 with DD Physical Planning Overview 20 l Installing the DLm VTEC hardware into a third party rack in the field 27 l DLm8500 DD Configuration and Host Connectivity 29 l DLm power requirements 31 l External network requirements 33 Disk Library for mainframe Physical Planning Guide for DLm8500 19 ...

Page 20: ...2 VTEs l 1 GbE or 2 1 GbE switches l 1 GbE or 2 10 GbE switches l One Data Domain DD DD6300 DD6800 single or HA DD9300 single or HA 9800 single or HA Note Despite the differences in weight the physical dimensions of all the cabinets are the same The following images show l A DLm8500 Single Rack Solution with one DD9800 one DS60 enclosure and one of each switch type l A DLm8500 Single Rack HA Solut...

Page 21: ...A DLm8500 Single Rack Solution with one DD9800 controller four ES30 enclosures and one of each switch l A DLm8500 Single Rack HA Solution with one DD9800 controller eight ES30 enclosures and two of each switches DLm8500 with Data Domain Physical Planning Disk Library for mainframe Physical Planning Guide for DLm8500 21 ...

Page 22: ...w l A DLm8500 Single Rack Solution with one DD9300 DD6800 one DS60 enclosure and one of each switch l A DLm8500 Single Rack HA Solution with two DD9300 DD6800s DS60 enclosures and two of each switches DLm8500 with Data Domain Physical Planning 22 Disk Library for mainframe Physical Planning Guide for DLm8500 ...

Page 23: ...500 Single Rack Solution with one DD6300 DD6800 DD9300 controller ES30 enclosures and one of each switch l A DLm8500 Single Rack HA Solution with two DD9300 DD6800 controllers ES30 enclosures and two of each switches DLm8500 with Data Domain Physical Planning Disk Library for mainframe Physical Planning Guide for DLm8500 23 ...

Page 24: ...9800 DLm supports DAEs with 2 TB 3 TB or 4 TB drives CAUTION The DLm8500 VTEC and Data Domain cabinet equipment enclosures and power systems are designed to support DLm8500 system equipment only Dell EMC does not support any other components in these cabinets and recommends that you do not install any additional equipment in the DLm8500 cabinets The following image shows a fully loaded multi rack ...

Page 25: ...n DLm8500 with Data Domain and ECS The following image shows a fully loaded Multiple Rack Solution DLm8500 with PowerMax and ECS storage DLm8500 with Data Domain Physical Planning Disk Library for mainframe Physical Planning Guide for DLm8500 25 ...

Page 26: ...re available by RPQ only l Two 10 GbE data switches l Two 1 GbE management switches l Two 16 Gb Fibre Channel data switches Note Only the DLm8500 for PowerMax has 16 Gb Fibre Channel switches The DLm VTEC cabinet has two power zones with independent power cables one for each side capable of powering the fully configured cabinet Note Channel extenders are not supported DLm8500 with Data Domain Phys...

Page 27: ...ing the DLm VTEC hardware into a third party rack in the field Issues to consider when installing the DLm8500 VTEC equipment into a third party rack in the field DLm VTEC equipment delivery in a Mini rack If a customer intends to install the DLm VTEC equipment VTE servers 1 GbE management switches 10 GbE data switches sliding service tray from a DLm8500 Single Rack Solution or a DLm8500 Single Rac...

Page 28: ...bles for the switches and to connect management network cables between the switches See DLm8500 with DD Physical Planning Overview on page 20 for the recommended installation positioning of DLm8500 Single Rack Solution equipment Note Do not insert any power cables or network cables through the holes in the sides of the switch rails as this could complicate FRU procedures for those switches DLm Min...

Page 29: ...d from 22 34 with 24 optimal 2 clearance for product bezels that are required in front of EIA rails and 30 clearance that is required behind front EIA rails for Dell EMC equipment and cable routing Inlet and exhaust areas of Dell EMC equipment should not be restricted Any panels or doors in front of them should have at least 50 open area Cabinet service access is required from the front and rear o...

Page 30: ...ffic Notes 20 TCP FTP Data Outbound To From SRS 21 TCP FTP Command Control Inbound Outbound To From SRS 22 TCP SSH SCP Secure Shell Secure Copy Inbound Outbound To From SRS 9443 TCP TCP GUI Communicatio n Outbound To SRS DLm8500 Physical Data Requirements This section provides an overview of physical data requirements A DLm8500 Single Rack Solution weighs 1329 lb 603 kg DLm8500 Multiple Rack Solut...

Page 31: ...se electrical specifications Specification Requirements Input voltage 200 V AC 240 V AC 10 10 single phase Frequency 50 Hz 60 Hz Circuit breakers 30 A Power zones Two Onsite power requirements for each cabinet l Two single phase drops each for DLm8500 VTEC cabinet Data Domain cabinet Note For required power drops see the Power Calculator at https powercalculator emc com and to any applicable docum...

Page 32: ...r consumption kVA Heat dissipation Btu Hr VTEC cabinet 3 70 12 300 External DD6800 DD9300 DD9800 cabinet 4 76 15 000 External DD6300 4 16 12 100 External Data Domain DAE storage cabinet 3 36 9600 a All cabinet values are calculated for a fully loaded configuration Contact your Dell EMC Sales Representative for specific supported configurations The following table provides details of power consumpt...

Page 33: ...ted to your organization network It is recommended that one port from each Management VTE is connected to one network switch and the other two ports are connected to another network switch This ensures that failure of one switch does not affect Management VTE connectivity The cables to connect these ports to your network are not supplied with DLm Provide four network cables to connect the Manageme...

Page 34: ...500 replication cable requirements continued DLm8500 1 GbE cables Data Domain 2 2 4 copper CAT 5 or CAT 6 DLm8500 with Data Domain Physical Planning 34 Disk Library for mainframe Physical Planning Guide for DLm8500 ...

Page 35: ... tasks to be completed when planning an installation of the DLm8500 with PowerMax system at the customer site l DLm8500 PowerMax Physical Planning Overview 36 l DLm8500 with PowerMax Physical Specifications 36 Disk Library for mainframe Physical Planning Guide for DLm8500 35 ...

Page 36: ...Two Brocade DS 6510B 16 Gb Fibre channel 48 port switches PowerMax system cabinet and storage cabinets This section provides an overview of PowerMax system cabinet and storage cabinets Dell EMC PowerMax Family Site Planning Guide provides more information about the PowerMax system cabinet and storage cabinets in the DLm8500 If there is any difference between the DLm Physical Planning Guide for DLm...

Page 37: ...ation of the VTEC cabinet Description Measurements Height 76 66 in 194 7 cm a Width 24 02 in 61 0 cm Depth 41 88 in 106 4 cm Clearance for service and airflow Front 42 in 106 7 cm Rear 42 in 106 7 cm Top 18 in 45 7 cm a With trim kit optional attached External network requirements in DLm8500 This section provides an overview of the requirements of external network for DLm8500 The preferred mechani...

Page 38: ...ectrical specifications Specification Requirements Input voltage 200 V AC to 240 V AC 10 10 single phase Frequency 50 Hz to 60 Hz Circuit breakers 30 A Power zones Two Power requirements at customer site for each cabinet Two single phase drops each for DLm8500 VTEC cabinet with up to one fully loaded Power distribution panel connectors NEMA L6 30P and the Facility power mating receptacle is L6 30R...

Page 39: ... Table 17 DLm8500 Multiple Rack Solution for PowerMax power consumption and heat dissipation System configuration descriptiona Total power consumption Heat dissipation Btu Hr VTEC cabinet 4 08 kVA 13 050 PowerMax cabinets 3 47 KVA 10 800 Refer to the Dell EMC PowerMax Family Site Planning Guide for information about the PowerMax cabinets a All VTEC cabinet values are calculated for a fully loaded ...

Page 40: ...DLm8500 with PowerMax Physical Planning 40 Disk Library for mainframe Physical Planning Guide for DLm8500 ...

Page 41: ...r discusses the environmental specifications and regulatory requirements common to all DLm models l Environmental specifications 42 l Regulatory compliance 43 l DLm touch current compliance 44 l Choosing a UPS 44 Disk Library for mainframe Physical Planning Guide for DLm8500 41 ...

Page 42: ...f the DLm system Note The air flow direction for cooling the systems should be from front to rear Table 19 Environmental requirements for shipping and storage Condition Setting Ambient temperature 40 F to 149 F 40 C to 65 C Temperature gradient 43 2 F hr 24 C hr Relative humidity 10 to 90 non condensing Maximum altitude 35 000 ft 10667 6 m Environment acclimation This section provides an overview ...

Page 43: ...h Leakage Current measurements exceed 3 5 mA r m s following conditions apply l The r m s Protective Conductor Current not exceeds five percent of the input current per line under normal operating conditions If the load is unbalanced the largest of the single phase currents shall be used for this calculation To measure the Protective Conductor Current the procedure for measuring Touch Current is u...

Page 44: ...transients interacting with the cabinet noise filters These differential devices have trip ratings of 5 mA to 500 mA and are mostly intended for consumer goods rather than fixed devices If the DLm cabinet is correctly grounded to the AC power source leakage current not produces a voltage leading to electrical shock Serious insulation breakdowns trip the breakers feeding the cabinet or preferably f...

Page 45: ...uirements for your DLm system operation an isolation transformer stabilizer installed in front of the UPS could further buffer the AC utility environmental factors from reaching DLm To determine if an isolation transformer stabilizer is needed consult a licensed electrician Environmental specifications and regulatory compliance Disk Library for mainframe Physical Planning Guide for DLm8500 45 ...

Page 46: ...Environmental specifications and regulatory compliance 46 Disk Library for mainframe Physical Planning Guide for DLm8500 ...

Page 47: ...ice area dimensions shipping information system placement and then removal l Dimensions and service area 48 l Shipping dimensions and clearance requirements 48 l System placement 50 l Package Removal 52 Disk Library for mainframe Physical Planning Guide for DLm8500 47 ...

Page 48: ...cess 18 0 in 45 7 cm Shipping dimensions and clearance requirements DLm8500 VTEC cabinets have the same dimensions This section provides the dimensions clearances and placement of the VTEC cabinets See Dell EMC PowerMax Family Site Planning Guide for dimensions clearances and placement of the PowerMax cabinets Data Domain Hardware Overview and Installation Guide provides corresponding Data Domain ...

Page 49: ...allet jack to position the packaged cabinet in its final location Leave approximately 96 in of clearance at the back of the cabinet to unload the unit and roll it off the pallet as illustrated in the following figure DLm8500 System Service Area and Removal Disk Library for mainframe Physical Planning Guide for DLm8500 49 ...

Page 50: ...his section provides information about DLm8500 floor cutouts configuration DLm8500 supports a maximum of two DD6300 DD6800 DD9300 or DD9800 systems or up to two PowerMax systems The following figure illustrates the configuration and the recommended floor tile cutouts for the DLm8500 configuration The figures assume that the floor tiles are 24 x 24 in 61 x 61 cm DLm8500 System Service Area and Remo...

Page 51: ...a stabilizer brackets to your site floor prepare the location for the mounting bolts The additional brackets help to prevent the cabinet from tipping while you service cantilevered levels The brackets provide two levels of protection for stabilizing the unit l Anti tip bracket Use this bracket to provide an extra measure of anti tip security One or two kits can be used For cabinets with sliding co...

Page 52: ... about installing the anti tip and anti move brackets Package Removal This section describes the procedures for inspecting and then unpacking the DLm8500 cabinets Inspect the system shipment This section describes about the inspection of system shipment About this task Inspect the outer packaging for signs of possible shipping damage If you notice visible damage Procedure 1 Note the damage on the ...

Page 53: ...the cabinets note the correct placement based on the overall system configuration and the floor tile cutouts to place each cabinet Leave approximately 96 in of clearance at the back of the cabinet to unload the cabinet and roll it off the pallet 2 Remove the shipping material a Cut the tape and straps that hold the cardboard carton together as illustrated in the next diagram Figure 15 Cutting the ...

Page 54: ...ormation about unpacking and setting up the DLm hardware Note After unpacking the unit allow it to stabilize in the new environment as specified in Environmental specifications on page 42 Dell EMC recommends that you open both the front and the rear doors to facilitate environmental acclimation DLm8500 System Service Area and Removal 54 Disk Library for mainframe Physical Planning Guide for DLm850...