background image

IM

PO

RTA

NT 

SA

FE

TY

 IN

STR

UC

TIO

NS

1. 

Re

ad

 a

nd

 F

ollo

w A

ll I

nst

ru

cti

on

s

2. 

Re

ad

 th

is 

ma

nu

al c

om

ple

te

ly 

be

fo

re 

att

em

pti

ng

 in

sta

lla

tio

n. 

3. 

All 

per

man

ent

 el

ect

ric

al c

onn

ect

ion

s s

hou

ld 

be 

mad

e b

y a

 qu

alif

ied

 el

ect

ric

ian

4. 

Co

nne

ct 

to

 a 

gro

und

ing

 ty

pe 

rec

ep

tac

le 

onl

y. I

f t

he 

ozo

ne 

gen

era

to

r e

lec

tri

cal

 co

nne

ctio

is 

to

 b

e a

tta

che

d t

o t

he 

po

ol c

ont

rol

s, b

e s

ure

 th

e p

oo

l c

ont

rol

s a

re 

pro

tec

ted

 b

y a

 G

rou

nd 

Fau

lt 

Circ

uit 

Int

err

up

ter

 (G

.F.

C.I.

). 

If 

the

 o

zo

ne 

gen

era

to

r is

 c

onn

ect

ed

 to

 a

n in

dep

end

ent 

ele

ctr

ica

l s

up

ply

, t

hen

 a

 G

.F.

C.I.

 m

ust

 b

e i

nst

alle

d b

etw

een

 th

e o

zo

ne 

gen

era

to

r a

nd

 th

ele

ctr

ica

l s

up

ply

5. 

Do

 n

ot 

bu

ry 

co

rd

6. 

War

nin

To 

red

uc

th

ris

of 

ele

ctr

ic

al 

sh

oc

k, 

rep

la

ce

 

da

ma

ge

co

rd 

 

im

me

dia

te

ly. 

7. 

In

sta

ll 

at 

le

ast

 5

 f

ee

(1

.5

 m

ete

rs)

 f

ro

wa

ll 

of 

po

ol. 

In

sta

ll 

ozo

ne

 g

en

era

to

 

no

 

le

ss 

th

an

 

on

(1

fo

ot 

ab

ove

 

ma

xim

um

 

wa

te

le

ve

to

 

pre

ve

nt 

wa

te

 

fro

co

nta

cti

ng

 

ele

ctr

ic

al 

eq

uip

me

nt.

 

In

sta

ll 

in

 

ac

co

rd

an

ce

 

wit

th

 

in

sta

lla

tio

n in

str

uc

tio

ns. 

8. 

Fo

llo

w a

ll a

pp

lic

ab

le

 e

le

ctr

ic

al c

od

es. 

9. 

Ele

ctr

ic

 

sh

oc

ha

za

rd

Be

 

su

re 

to

 

tu

rn

 

po

we

OF

an

dis

co

nn

ec

fro

 

po

we

so

urc

be

fo

re 

an

se

rvi

ce

 w

ork

 i

pe

rfo

rm

ed

Fa

ilu

re 

to

 d

so

 c

ou

ld 

 

res

ult

 in

 se

rio

us 

in

ju

ry 

or 

de

ath

10

Th

ozo

ne

 

ge

ne

ra

to

mu

st 

be

 

in

sta

lle

in

 

an

 

ou

td

oo

lo

ca

tio

n, 

or 

in

do

ors 

 

in

 

fo

rce

air

 

ve

nti

la

te

ro

om

an

in

sta

lle

so

 

th

at 

th

ori

en

ta

tio

is 

 

exa

ctl

y a

s s

ho

wn

 in

 F

ig

ure

 1

11

Mo

un

th

ozo

ne

 g

en

era

to

so

 t

ha

it 

is 

in

ac

ce

ssi

ble

 t

an

yo

ne

 i

th

po

ol. 

 

Ne

ve

r a

tte

mp

t a

ny 

se

rvi

cin

g w

hile

 u

nit

 is

 w

et. 

12

Pla

sti

ozo

ne

 

su

pp

ly 

tu

bin

is 

su

pp

lie

wit

th

ozo

ne

 

ge

ne

ra

to

r. 

Ne

ve

 

rep

la

ce

 th

is 

tu

bin

g w

ith

 m

eta

l t

ub

in

g. 

13

War

nin

Sh

ort

-te

rm

 

in

ha

la

tio

of 

hig

co

nc

en

tra

tio

ns 

of 

ozo

ne

 

an

lo

ng 

 

te

rm

 

in

ha

la

tio

of 

lo

co

nc

en

tra

tio

ns 

of 

ozo

ne

 

ca

ca

use

 

se

rio

us 

ha

rm

fu

 

ph

ysi

olo

gic

al e

ffe

cts

. D

O N

OT

 in

hal

e o

zo

ne 

gas

 p

ro

du

ced

 b

y t

his

 d

evi

ce. 

14. 

For 

your 

safety, 

do 

not 

store 

or 

use 

gasoline, 

chemicals 

or 

other 

flammable 

 

liquids or vapors near this or any other appliance. 

                          

SA

VE

 T

HE

SE

 IN

ST

RU

CT

IO

NS

.

2

EC-AG1, EC-AG2

EC-AG1-25

Summary of Contents for EC-AG1

Page 1: ......

Page 2: ...in accordance with the installation instructions 8 Follow all applicable electrical codes 9 Electric shock hazard Be sure to turn power OFF and disconnect from power source before any service work is...

Page 3: ...be refused Upon receipt of preauthorized returned goods DEL Ozone will repair or replace at DEL Ozone s option the defective product s and return them freight prepaid for products under warranty Buyer...

Page 4: ...transferable to any subsequent owners or purchasers of such products DEL Ozone warrants that it or its authorized dealers will repair or replace at its option any part of such products proven to be de...

Page 5: ...as well as environmental conditions like UV sunlight will tend to deteriorate the supplied ozone tubing This is normal and acceptable as long as the tubing doesn t become cracked and leak Because of t...

Page 6: ...r See Figure 2a or Figure 2b CD Ozone System Figure 2 Installation Schematic for Injector Assembly 6 Check Valve EC AG Ozone Generator Ozone Out Fitting Ozone Supply Tubing Pump Filter Heater EC AGX I...

Page 7: ...AGX Installation Operation Manual 7 Venturi Injector 1 1 2 Nipple Ozone Port Unplugged 1 1 2 Elbow Hose Barb Fitting Pool Return Hose Stainless Steel Hose Clamp 2D 2 Ozone Gas Line Connect the end of...

Page 8: ...Manual 9 4B System Maintenance 4B 1 Ordering Information To locate a dealer nearest you call 1 800 676 1335 ext 249 or visit our web site www delozone com Be prepared with the following information N...

Reviews: